183
the values that will be used on the DUT and connect the test cables, test fixture, or
Scanner channel to the instrument. Next, short the ends of the test cables and press
the TEST button. The highlighted parameter field will briefly show the word
“READING” and then display the new value. The new value is automatically updated
in the field and does not allow an escape to the original value or require that the
ENTER key be used to accept the new parameter.
DualCHEK
This function allows the instrument to simultaneously run a hipot and AC Ground Bond
test. While pressing the “DualCHEK” soft key, the DualCHEK pop up screen will
appear as follows:
Use the up or down arrow keys to select the DualCHEK setting for this test. The
DualCHECK setting options are ACW, DCW or OFF.
Once a parameter is edited, it is necessary to complete the edit either by pressing the
ENTER key to accept the new value or the EXIT key to escape from the edit and
return to the original value.
For the DualCHEK to function properly, the test immediately following the AC Ground
Bond test in the sequence must be the test specified in the DualCHEK parameter. For
example, if DualCHEK is set to ACW, the next test in the sequence after the AC
Ground Bond test must be an ACW test. If the test immediately following the AC
Ground test does not match the DualCHEK setting, the AC Ground Bond test and
following test will run sequentially.
51 PLC Voltage Control (8206, 8207, 8256, 8257) (Discontinued)
Содержание OMNIA II 8204
Страница 8: ...2 This Page Intentionally Left Blank ...
Страница 87: ...81 conditions The different combinations are represented in the table below ...
Страница 91: ...85 ...
Страница 92: ...86 ...
Страница 139: ...133 7 128 Power On PROMPT ESR ESE STB SPOLL SRE ESE SRE ...
Страница 141: ...135 and added to with the ADD command This will avoid constantly writing to the non volatile memory ...
Страница 142: ...136 ...
Страница 156: ...150 appear on the display ...
Страница 169: ...163 Print Report Example ...
Страница 181: ...175 ...