Armarac
MX800N4X
Series
Installation
Guide
v1.1
|
September
‐
2015
Page
35
of
56
Step
3
–
Structured
Cabling
Ensure
the
cable
tails
are
long
enough
to
fully
open
the
Vertiblade
zigzag
to
access
the
UPS
in
the
rear
mounting
bay.
Terminate
each
loom
on
the
appropriate
patch
panel
in
accordance
with
the
cabling
standard
being
adopted
(Cat
‐
5
or
Cat
‐
6).
Check
that
the
Vertiblade
brackets
can
open
and
close
without
causing
strain
on
the
structured
cabling
or
interfering
with
the
hinging
mechanism.