Armarac
MX800N4X
Series
Installation
Guide
v1.1
|
September
‐
2015
Page
27
of
56
8.
Installing
Structured
Cabling
Step
1
–
Patch
Panel
Mounting
Preparation
Determine
whether
your
cable
entry
will
be
top
‐
down,
bottom
‐
up
or
both.
Determine
how
many
19
‐
inch
patch
panels
are
to
be
installed
inside
the
Armarac
enclosure.
Using
a
mini
hacksaw
remove
the
required
number
of
patch
panel
“knockouts”
from
the
upper
and/or
lower
patch
panel
mounting
trays
.
Step
2
–
Install
your
patch
panels
Any
industry
standard
19
‐
inch
patch
panels
can
be
installed
within
the
Armarac.
The
patch
panel(s)
can
be
installed
on
to
patch
panel
mounting
tray
using
four
M5
(10/32)
fasteners
for
each
patch
panel.
Step
3
–
Structure
Cabling
Access
Structured
cabling
can
feed
through
the
19
‐
inch
openings
located
on
the
top
and/or
the
bottom
of
the
Armarac
chassis.
Remove
the
conduit
termination
plate
with
a
2.5mm
hex
key.
Step
4
–
Terminating
Conduit
If
using
conduit
to
run
your
cables
to
the
Armarac
enclosure
then
you
can
use
the
removable
conduit
termination
plate
to
terminate
your
conduit
to.
The
conduit
termination
plate
has
indentations
ready
to
assist
in
drilling
the
holes
to
fit
the
cable
glands.