background image

 

Armarac

 

MX800N4X

 

Series

 

Installation

 

Guide

 

v1.1

 

|

 

September

2015

 

Page

 

31

 

of

 

56

 

10.

 

Vertiblade

 

Screw

 

Adapters

 

Different

 

equipment

 

manufacturers

 

often

 

use

 

different

 

retention

 

screw

 

thread

 

sizes

 

to

 

hold

 

their

 

equipment

 

to

 

the

 

rack

 

kits.

 

The

 

Armarac

 

has

 

a

 

series

 

of

 

corresponding

 

server

 

Screw

 

Adapters

 

to

 

suit

 

each

 

type

 

of

 

thread

 

to

 

ensure

 

that

 

all

 

equipment

 

is

 

securely

 

fastened

 

to

 

its

 

Vertiblade.

 

 

Step

 

1

 

 

Determine

 

the

 

correct

 

thread

 

requirement

 

Choose

 

between

 

the

 

M4,

 

M5

 

(10/32)

 

and

 

M6

 

Vertiblade

 

screw

 

adapters

 

to

 

match

 

your

 

equipment

 

manufacturer’s

 

server

 

retention

 

screw

 

thread

 

size.

 

 

Step

 

2

 

 

Remove

 

the

 

current

 

thread

 

adapters

 

Using

 

a

 

diameter

 

2.5mm

 

hex

 

key

 

unscrew

 

the

 

set

 

screw

 

to

 

remove

 

the

 

existing

 

black

 

nylon

 

screw

 

adapter

 

on

 

both

 

sides

 

of

 

the

 

Vertiblade

 

mounting

 

system

 

and

 

lift

 

up

 

to

 

remove.

 

 

 

Step

 

3

 

 

Install

 

the

 

correct

 

thread

 

adapters

 

Insert

 

the

 

new

 

Screw

 

Adapter

 

in

 

to

 

the

 

top

 

of

 

the

 

Vertiblade

 

bracketing,

 

aligning

 

the

 

screw

 

recess

 

to

 

face

 

the

 

direction

 

of

 

the

 

set

 

screw.

 

Using

 

a

 

hex

 

key

 

tighten

 

the

 

set

 

screw

 

until

 

the

 

new

 

screw

 

adapter

 

is

 

firmly

 

held

 

in

 

place.

 

 

 

Содержание Armarac MX-800-N4X

Страница 1: ...TALLATION AND OPERATION GUIDE FOR MORE INFORMATION 2014 Thureon International Limited Patents Pending All specifications subject to change without notice Revision 1 1 September 2015 please contact us...

Страница 2: ...567776 THUREON ARMARAC and VERTIBLADE are trademarks owned by Thureon Limited and are registered under the following numbers in Australia 1168105 1168108 1168107 Canada TMA737018 TMA737025 TMA737026 N...

Страница 3: ...n Thureon can only warrant to the original purchaser the safety reliability and performance of the Armarac system and accessories if it is assembled operated extended and modified as specified in this...

Страница 4: ...n a shock hazard General The safety instructions manual for the enclosures shall contain the following statements or equivalent and it is shall ship with each product o Provide the minimum spacings be...

Страница 5: ...th legally applicable requirements WEEE Waste electrical and electronic equipment This symbol on the product accessories or its packaging shows that the product may not be disposed of with residual wa...

Страница 6: ...nstalling a PDU http youtu be 9R5Xn1QpL38 list UUOV2 mgBIA8LFefCd I8OvDA Installing a UPS http youtu be KBdj5Da_Q0U list UUOV2 mgBIA8LFefCd I8OvDA Installing a Server http youtu be PtF1uK4CbJc list UU...

Страница 7: ...ch Panel http youtu be Lw4H FG7fvc list UUOV2mgBIA8LFefCd I8OvDA Installing a Switch http youtu be LCVXZoT2hOE list UUOV2 mgBIA8LFefCd I8OvDA Installing Cabling http youtu be khAcNAC6o7Q list UUOV2 mg...

Страница 8: ...a load bearing wall 6 Connecting a power supply 7 Installing air conditioning modules 8 Installing structured cabling Section C Equipment Mounting 9 Vertiblade conversion 10 Vertiblade screw adapters...

Страница 9: ...clear unobstructed wall Due to the weight of the Armarac enclosure and that of the possible equipment it may contain it is essential to ensure that the wall and fasteners are of adequate strength to...

Страница 10: ...avy Duty Anchor HUS H Universal Screw Anchor Or equivalent such as SPAX 3 5 bolts for wooden walls Masonry Concrete Block Concrete Slab Brick Hilti HSL Expansion Anchor M8 note suitable for brick Or e...

Страница 11: ...d if the following minimum clearances are not maintained 4 1 Single MX800N4X Armarac Floor level 1715mm 67 5in to top of chassis Ceiling Height Minimum 2160mm 7ft 1in Minimum 600mm 24in to nearest wal...

Страница 12: ...Series Installation Guide v1 1 September 2015 Page 12 of 56 4 1 Single MX800N4X Armarac continued Floor level 1715mm 67 5in to top of chassis Ceiling Height Minimum 2160mm 7ft 1in 630mm 24 8in To Flo...

Страница 13: ...er on a single wall They could also be a combination of FAN and N4X models please contact Thureon for more information Floor level 1255mm 49 4in to top of chassis Ceiling Height Minimum 2 75m 9ft Mini...

Страница 14: ...x and place to one side Unlock the Armarac doors All keys are located in the accessories box that shipped inside the Armarac box MLOCK unlock the doors using the key barrel locks located on the front...

Страница 15: ...d recommended clearances and spacing referred to Section A 4 above proceed to mark out the wall Hold the mark the top left hole center 1650mm 65in above floor level if mounting to a timber framed wall...

Страница 16: ...in place by the top two fasteners mark and drill the remaining six holes through the chassis mounting holes Fit and tighten the remaining six fasteners Step 6 Confirm Chassis is secure Confirm all eig...

Страница 17: ...eceptacles 6 1 Internal IEC C19 power receptacles Step 1 Remove the power receptacle Remove the upper and lower Patch Panel Mounting Trays from within the chassis using a 2 5mm hex key Remove the powe...

Страница 18: ...the rear of the chassis using a 2 5mm hex key Reposition the power socket cover on the chassis over to the right hand side as shown Step 2 Install connect the power outlet If the power outlet is alrea...

Страница 19: ...1 Installing the Right Hand AirCon Module Step 1 Debox your aircon IceQube modules Cut the cardboard packaging away where indicated on the outside of the IceQube box Remove the packaging to expose the...

Страница 20: ...pose all the sfasteners Remove the black M6 Button head screws from around the perimeter of the Aircon Mount Panel Use the 4 0mm Ball end hex driver supplied in the Accessories box Once unscrewed remo...

Страница 21: ...C19 H320P plug on to the end of the power cable The recommended length from the panel is 380mm 15in Step 7 Fit the Earth Ground wire to the IceQube module On the opposite side of the IceQube chassis f...

Страница 22: ...on the same side as the power egress in Step 6 Place the end of the drain hose in the center of the grommet provided and trim any excess pipe away This length will differ from RHS or LHS mounting Step...

Страница 23: ...he right hand door up to the frame and slide it on to its hinges Open the door to its full extent against the wall provide protection for the paintwork if necessary from brickwork etc Step 12 Fit the...

Страница 24: ...ssories box Step 14 Connect Control Cables Pass the IceQube control cables through the opening on the front of the control panel Carefully connect the 8 way and 4 way PCB connectors in the correct ori...

Страница 25: ...engagement Note these are locking receptacle and require the red pin to be pushed in order to release the plug Reconnect the outer door shell ground wire from the control panel area to the correspond...

Страница 26: ...described in the above steps However it is important to note i Routing the power cable on the LHS iceqube frame is to the opposite side ii Routing and securing the Condensate Drain pipe within the ice...

Страница 27: ...try standard 19 inch patch panels can be installed within the Armarac The patch panel s can be installed on to patch panel mounting tray using four M5 10 32 fasteners for each patch panel Step 3 Struc...

Страница 28: ...Fit the cable shroud to the Armarac chassis using the supplied T loop hex driver 3 If using conduit predrill the conduit gland holes in the termination plate prior to reaffixing Step 6 Installing the...

Страница 29: ...resent your equipment sizes Note The heaviest equipment such as Uninterruptible Power Supplies UPS and Battery Modules should be placed as far to the back of the Vertiblade system as possible Converti...

Страница 30: ...en the set screws until the adapters are firmly held within the extrusions Step 4 Combine the right hand Vertiblade latch bodies Place the two latch bodies together as shown Using the two supplied M6...

Страница 31: ...irement Choose between the M4 M5 10 32 and M6 Vertiblade screw adapters to match your equipment manufacturer s server retention screw thread size Step 2 Remove the current thread adapters Using a diam...

Страница 32: ...n maximum access to the rear mounting space Noting that the rear most equipment bay does not hinge Step 2 Install your first device Carefully lift the device in to the 19 inch opening Take care to ali...

Страница 33: ...zigzag Vertiblade bracket using cage nuts The RJ45 ports should be to the front and number port number 1 to the bottom Use four appropriate sized screws to secure each patch panel in to cage nuts Step...

Страница 34: ...ep 1 Main Power Supply If used connect the chassis power outlet to your UPS inlet or power distribution unit PDU Do not turn your UPS on yet Step 2 Device Power Distribution Continue to run AC power c...

Страница 35: ...o fully open the Vertiblade zigzag to access the UPS in the rear mounting bay Terminate each loom on the appropriate patch panel in accordance with the cabling standard being adopted Cat 5 or Cat 6 Ch...

Страница 36: ...nect from Port 1 on the front LAN switch to Port 1 on the left most patch panel Repeat for all 24 ports Carefully loom the 24 cores together adhering to cabling standards Step 5 Check for Interference...

Страница 37: ...c MX800N4X Series Installation Guide v1 1 September 2015 Page 37 of 56 Section D Operation 13 Aircon Module Operation Refer to IceQube Thermal Management Center operating Instructions available from T...

Страница 38: ...ed above the console panel in the bottom of the Armarac The web management interface is available from HTTP 192 168 1 50 The MAC address of each EcoSys board is printed on a label affixed to the conso...

Страница 39: ...rmarac MX800N4X Series Installation Guide v1 1 September 2015 Page 39 of 56 14 1 3 Current Status page The current status page displays the current environment and alert status of the Armarac enclosur...

Страница 40: ...f 56 14 1 4 Manual Control page The ADMIN user can use this page to override the automatic settings to remotely control Inlet fan speed Outlet fan speed Door unlock if MX ELOCK option is fitted Low Am...

Страница 41: ...1 September 2015 Page 41 of 56 14 1 5 Device Setup page The Device Setup page is where the ADMIN user can change the networking and device informational settings Currently there is a SMTP and a SNMP v...

Страница 42: ...Armarac MX800N4X Series Installation Guide v1 1 September 2015 Page 42 of 56 14 1 5 Device Setup page This is the SNMP screen...

Страница 43: ...r maximum cooling effect Heater On Temp the temperature at which the Low Ambient Heater if fitted will turn on Heater Off Temp the temperature at which the Low Ambient Heater if fitted will turn off H...

Страница 44: ...44 of 56 14 1 7 Logs page The Logs page displays the latest status and alerts of EcoSys controller A full diagnostic download in CSV format is available by right clicking the download full log file li...

Страница 45: ...itical that you confirm with Thureon which model of Ecosys controller is in your Armarac as not all versions of firmware and or webpages are compatible with every series of board These instructions as...

Страница 46: ...of 56 5 The Upgrade In Progress screen will display Do not turn off the Armarac power supply to the EcoSys board during this time 6 Once the firmware upgrade is complete the Upgrade Complete screen w...

Страница 47: ...bout tab 3 Verify the webpages version currently on the board Click Browse to locate the new webpages bin file At the time of printing Armarac Webpages v02 04 bin is the current stable release 4 Once...

Страница 48: ...g then release the LOAD button 4 Disconnect the power supply from the Ecosys The internal storage for webpages and log files is now cleared and ready to load webpages 5 Re power the Ecosys board Note...

Страница 49: ...stallation Guide v1 1 September 2015 Page 49 of 56 10 Click on the MPFS Upload hyperlink select Choose File browse to and select Armarac Webpages v02 04 bin current stable release 11 Click Upload to s...

Страница 50: ...56 12 Click on the Site main page hyperlink once the upgrade process is finished and the webpages should show 13 Programing the device is now complete Any device setup can now be undertaken Please ref...

Страница 51: ...y Carefully replace the dry foam filter in the cavity and replace the cover panel fasten the captive screws to hold firm Replacing Cleaning Left Door Filters if fitted Remove the Filter cover panel us...

Страница 52: ...from the end of the faulty power supply Remove the faulty power supply s output 2 5mm DC plug from the EcoSys controller board Step 3 Remove the faulty Power Supply Remove the Velcro straps from the...

Страница 53: ...Armarac MX800N4X Series Installation Guide v1 1 September 2015 Page 53 of 56 Section F Reference Documents Armarac MX800N4X Cut Sheet Armarac MX800N4X Tech Spec...

Страница 54: ...Perspective View Side View Front View 980mm 1130mm 461mm 592mm 720mm 980mm 400mm crs 270mm 410mm 270mm 95mm 85mm 592mm 23 4in 18 1in 38 5in 23 3in 38 5in 16in crs 3 7in 23 3in 10 6in 16 1in 10 6in 3...

Страница 55: ...odula Cut Sheets MX 800 N4X Single Unit Thureon Limited Registered Design Patents Pending All specifications subject to change without notice Top View Perspective View Front View 1694mm 1130mm 555mm 4...

Страница 56: ...cifications subject to change without notice Cooling Schematic Ambient Air Flow inlet RHS Ambient Air Flow inlet LHS Ambient Air Flow outlet RHS w o exhaust box Conditioned Enclosure Air Flow closed c...

Отзывы: