Armarac
MX800N4X
Series
Installation
Guide
v1.1
|
September
‐
2015
Page
36
of
56
Step
4
–Patch
Leads
Open
the
Vertiblade
to
90
degrees
to
access
the
zigzag
bracket
with
the
six
patch
panels.
Using
1.0m
(3ft)
approved
patch
leads,
connect
from
Port
1
on
the
front
LAN
switch
to
Port
1
on
the
left
most
patch
panel.
Repeat
for
all
24
ports.
Carefully
loom
the
24
cores
together
adhering
to
cabling
standards.
Step
5
–
Check
for
Interference
Ensure
that
each
Vertiblade
bracket
can
fully
open
without
cables
pinching
or
pulling
on
any
device
or
patch
panel.
Ensure
that
the
Armarac
doors
can
close
without
causing
interference
with
any
cables
or
the
ventilation
fans.