RAIDER
2000
-
12
-
OPERATOR FOR SWING GATES
English
TERMINOLOGY AND SYMBOLS USED IN THIS MANUAL
•
INSTALLATION AREA
the area required to perform installation in which the presence of persons is hazardous for the persons
themselves (Appendix I, 1.1.1 Directive 98/37/EEC);
•
EXPOSED PERSON
any person located in full or in part in a hazardous area (Appendix I, 1.1.1 - Directive 98/37/
EEC);
•
INSTALLER
person responsible for installation, operation, adjustment, maintenance, cleaning, repair and transporting
of the device (Appendix I, 1.1.1 - Directive 98/37/EEC);
•
RESIDUAL HAZARD
risks which cannot be eliminated or suf
fi
ciently reduced as part of the design process.
Warning
!
This symbol is used to mark information, instructions and procedures which if ignored could lead
to death and serious injury and which could create a long-term health and environmental hazard.
Caution
This symbol is used to mark information, instructions and procedures which if ignored can cause
serious damage to the machine or to the product.
Information
The symbol is used to mark important information which if ignored could void your warranty.
Terminology and symbols used in this manual
12
Safety Standards and Installer Obligations
13
Warnings for the user
13
1. Description of the operator
14
1.1
Envisaged use and field of application ..................................................................................................... 14
1.2 General
features
...................................................................................................................................... 14
1.3 Dimensions
.............................................................................................................................................. 14
1.4 Technical
data
.......................................................................................................................................... 14
1.5 Installation
components
........................................................................................................................... 15
2. Preliminary installation operations
16
2.1
Preparing electrical connections .............................................................................................................. 16
2.2
Checking the gate .................................................................................................................................... 17
2.3
Positioning of mountings .......................................................................................................................... 17
2.4
Preparation of the rear mounting ............................................................................................................. 18
2.5
Making a niche on the masonry pillar for rear mounting .......................................................................... 18
3. Installation
19
3.1
Securing the rear mounting ...................................................................................................................... 19
3.2
Installation of the operatoron the rear mounting ...................................................................................... 19
3.3
Front operator placement ......................................................................................................................... 20
3.4
Checking the mechanical installation ....................................................................................................... 20
3.5
Adjustment of mechanical limit stops ....................................................................................................... 20
4. Checking and adjustment
21
5. Operator - Permitted uses
21
5.1
Motor release for manual gate movement (EMERGENCY RELEASE) ................................................... 21
5.2 Scheduled
maintenance
........................................................................................................................... 21