Page 33 of 60
15. Point Type List
Point Type
Base Type
Job Settings
Description
Point Soldering
PTP Point
Point Job
After moving to the teaching point,
Point Soldering is executed with the
programmed soldering condition.
Point Soldering (No Up)
PTP Point
Point Job
After moving to the teaching point,
Point Soldering is executed with the
programmed soldering condition.
The air cylinder is not retracted.
(Iron cartridge is not raised.)
Start of Line Soldering
CP Start Point
Point Job
After moving to the teaching point,
Line Soldering starts with the
programmed soldering condition and
speed.
Line Passing
CP Passing Point
-
Arc Point
CP Arc Point
-
End of Line Soldering
CP End Point
After moving to the teaching point by
CP drive, soldering is executed with
the programmed remaining soldering
condition.
Start of Easy Line Soldering
CP Start Point
Point Job
After moving to the teaching point,
Line Soldering starts with the
programmed soldering condition and
line speed.
(This condition is different from the
Start of Line Soldering condition.)
Easy Line Passing
CP Passing Point
-
Arc Point
CP Arc Point
-
End of Easy Line Soldering
CP End Point
After moving to the teaching point by
CP drive, soldering is executed with
the programmed remaining soldering
condition.
Pre Solder
PTP Point
Point Job
Same as the Point Soldering.
The iron does not go up / down,
Cleaning Point
PTP Point
Point Job
After moving to the teaching point,
air-blow is executed with the
programmed time.
Cleaning Start Point
CP Start Point
Point Job
Same function as CP Start Point.
Cleaning End Point
CP End Point
-
Same function as CP End Point.
Sponge Cleaning (CW)
PTP Point
Before Moving
Point Job
For the Sponge Roller Cleaner SRC-
500DC. The sponges start rotating
clockwise before axes moving.
Then the axes moves to the teaching
point. The sponges stop rotating
after the programmed time.
Sponge cleaning (CCW)
PTP Point
Before Moving
Point Job
For the Sponge Roller Cleaner SRC-
500DC. The sponges start rotating
counterclockwise before axes
moving. Then the axes moves to
the teaching point. The sponge
rotation stops after the programmed
time.
Start of Sponge Cleaning
CP Start Point
Before Moving
Point Job
For the Sponge Roller Cleaner SRC-
500DC. The sponge starts rotating
clockwise. Then the axes move to
the teaching point. After the
programmed time, CP drive starts
with the programmed speed.
Содержание J-CAT200 COMET
Страница 5: ...Page 5 of 60 3 Dimensions J CAT200 COMET...
Страница 6: ...Page 6 of 60 J CAT300 COMET...
Страница 7: ...Page 7 of 60 J CAT400 COMET...
Страница 8: ...Page 8 of 60 J CAT500 COMET...