![Ankom TDF Скачать руководство пользователя страница 67](http://html.mh-extra.com/html/ankom/tdf/tdf_operators-manual_2944721067.webp)
Operator’s
Manual
Rev
A
4/30/12
pg.
67
4.
Remove
the
containers
with
fluid.
5.
Install
the
empty
pre
‐
weighed
beakers
under
all
six
IDF
Delivery
Nozzles
and
press
the
OK
button.
While the fluids are being delivered, the following screen is displayed.
When the fluid delivery is complete, the following screen is displayed.
Volume
Calibration
←
Final
fluid
delivery
in
progress...
←
Place
Calibration
containers
under
IDF
Delivery
Nozzles.
Press
OK
when
done.
OK
Содержание TDF
Страница 2: ...This page intentionally left blank ...
Страница 4: ...This page intentionally left blank ...
Страница 16: ...Operator s Manual pg 16 Rev A 4 30 12 This page intentionally left blank ...
Страница 30: ...Operator s Manual pg 30 Rev A 4 30 12 This page intentionally left blank ...
Страница 46: ...Operator s Manual pg 46 Rev A 4 30 12 This page intentionally left blank ...
Страница 56: ...Operator s Manual pg 56 Rev A 4 30 12 This page intentionally left blank ...
Страница 70: ...Operator s Manual pg 70 Rev A 4 30 12 This page intentionally left blank ...
Страница 72: ...Operator s Manual pg 72 Rev A 4 30 12 This page intentionally left blank ...