![Ankom TDF Скачать руководство пользователя страница 39](http://html.mh-extra.com/html/ankom/tdf/tdf_operators-manual_2944721039.webp)
Operator’s
Manual
Rev
A
4/30/12
pg.
39
11.11
If you plan to check the pH during the IDF process, press the Yes button. Otherwise, press the No button. The
following screen will be displayed.
11.12
The instrument is now completely set up and ready to automatically run the TDF procedure. Press the START
button to begin. At the beginning of each new run, the instrument automatically runs a test to check for leaks in
the tubing.
For the first run after a power-up cycle, or for the first run after the instrument has sat idle for twelve hours, the
following status screen will be displayed.
If the fluid lines are already charged properly, or when the line charge is complete, the following status screen will
be displayed.
Status
Overall
Progress
Action
in
progress
IDF
Time
remaining:
Lines
Charging
Please
wait…………..
XX:XX:XX
SDF
Time
remaining:
XX:XX:XX
pH
required?
Display
Temperatures
Yes
AOAC
991.43
TDF
Press
START
to
begin
AOAC
991.43
TDF
←
START
Check
pH
manually?
AOAC
991.43
TDF
←
Yes
No
Содержание TDF
Страница 2: ...This page intentionally left blank ...
Страница 4: ...This page intentionally left blank ...
Страница 16: ...Operator s Manual pg 16 Rev A 4 30 12 This page intentionally left blank ...
Страница 30: ...Operator s Manual pg 30 Rev A 4 30 12 This page intentionally left blank ...
Страница 46: ...Operator s Manual pg 46 Rev A 4 30 12 This page intentionally left blank ...
Страница 56: ...Operator s Manual pg 56 Rev A 4 30 12 This page intentionally left blank ...
Страница 70: ...Operator s Manual pg 70 Rev A 4 30 12 This page intentionally left blank ...
Страница 72: ...Operator s Manual pg 72 Rev A 4 30 12 This page intentionally left blank ...