Amsco Gemini Скачать руководство пользователя страница 9

2-1

Installation

Operator Manual

129360-627

2

Before Installing

Equipment

INSTALLATION VERIFICATION

An Equipment Drawing showing all of the space and utility requirements was
sent to the purchaser after the order for this Surgical Lighting Fixture was
received. The clearance space shown on the drawing is necessary for proper
installation, operation, and maintenance of the fixture.

Installation and Uncrating Instructions were furnished with the Lighting Fixture.

If any of these documents are missing or misplaced, contact STERIS, giving the
serial, unit, and model numbers of the equipment.  Replacement copies will be
sent to you promptly.

WARNING - ELECTRIC
SHOCK AND BURN HAZ-
ARD:  Disconnect all electri-
cal input to the lighting sys-
tem before servicing. Do not
service the lighting system
unless all electrical input
has been properly locked
out. Always follow OSHA
lock-out/tagout and electri-
cal safety related work prac-
tice standards. (See 29 CFR
1910.147 and .331 through
.335.)

Before operating this equipment, complete the preoperation checklist. It is
essential to the safe operation and continuing maintenance of this equipment
to ensure  installation is complete and correct. (Refer to Figure 1 to locate parts.)

Equipment Installation shall include a means of isolation from the main power
supply. For permanently installed equipment, the neutral contactor shall not be
fused.

Figure 1.  INSTALLATION CHECKLIST

Check Four

Roll Pins

Check Bolt

at Base

of Support Tube

Floor Stand Units

All Ceiling Mounted Units

Check Two

Drive Rivets

Track Mounts

Single and Dual Mounts

Check Two

Roll Pins

Check Four

Drive Rivets

Verify Carriage Moves Freely on Track

Verify Assembly

Rotates Smoothly

Installation

Checklist

Check four

Allen-head

Screws

Verify Suspension Pin in Place

Check Two

Locating Pins and

Eight Allen-head

Screws

Содержание Gemini

Страница 1: ...urgical procedures obstetrics and specialized examinations Indications for Use A thorough preventive maintenance program is essential to safe and proper light fixture operation This manual contains maintenance schedules and procedures which should be followed for satisfactory equipment perfor mance You are encouraged to contact STERIS concerning our comprehensive Annual Maintenance Agreements Unde...

Страница 2: ...imize potentially damaging infrared heat in the surgical field Illumination intensity of the Gemini Surgical Light can be adjusted through three intensity settings and two pattern settings on the lighthead control Typical illumination perfor mance can be expected to range between approximately 3 000 footcandles using the large pattern and 6 000 footcandles using the small pattern For the protectio...

Страница 3: ...iii Table of Contents Operator Manual 129360 627 This Page Intentionally Left Blank ...

Страница 4: ...by STERIS Corporation 2720 Gunter Park East Montgomery AL 36109 USA TEL 334 277 6660 FAX 334 271 5450 Class 1 Equipment Type B Equipment Ordinary Equipment enclosed equipment without protection against ingress of water Equipment not suitable for use in the presence of a flammable anaesthetic mixture with air or with oxygen or nitrous oxide Continuous Operation Manufactured Exclusivelyby STERISCorp...

Страница 5: ...ION 3 1 General 3 1 Lighthead 3 1 Ceiling Mount System 3 1 Floor Stand System 3 1 Track Mount System 3 1 4 OPERATING INSTRUCTIONS 4 1 Advisory 4 1 Operating This Equipment 4 2 5 ROUTINE MAINTENANCE 5 1 Preventive Maintenance Schedule 5 1 Daily Maintenance 5 2 As Required 5 3 Cleaning Procedures 5 3 6 TROUBLESHOOTING 6 1 General 6 1 7 SERVICE PROCEDURES 7 1 Bimonthly Maintenance 7 1 Quarterly Maint...

Страница 6: ...vi 129360 627 Operator Manual Table of Contents This Page Intentionally Left Blank ...

Страница 7: ...llelectricalinputhasbeenproperlylockedout AlwaysfollowOSHAlock out tagoutandelectricalsafetyrelated work practice standards See 29 CFR 1910 147 and 331 through 335 WARNING EXPLOSION HAZARD Do not use lighting fixture in the presence of flammable anesthetics CAUTION POSSIBLE EQUIPMENT DAMAGE Two people are required when inspecting suspension arm lighthead mounting integrity Do not bump lightheads i...

Страница 8: ...1 2 129360 627 Operator Manual Listing of Warnings and Cautions This Page Intentionally Left Blank ...

Страница 9: ...l input has been properly locked out Always follow OSHA lock out tagout and electri calsafetyrelatedworkprac tice standards See 29 CFR 1910 147 and 331 through 335 Before operating this equipment complete the preoperation checklist It is essential to the safe operation and continuing maintenance of this equipment toensure installationiscompleteandcorrect RefertoFigure1tolocateparts Equipment Insta...

Страница 10: ...t the four Allen head screws in the side of ceiling flange are tight ____ Check that the two locating pins in the extension arm adaptor are in place and that the eight Allen head screws securing adaptor to suspension tube are tight ____ Verify rubber bumper stops are in place ____ Verify two roll pins are in place securing adaptor to suspension arm and that pins are flush with adaptor surface ____...

Страница 11: ...eadiscontrolledfromacontrolpanellocatedonthefrontofthelighthead OFF STANDBY touch pad is used to turn the power on to the lighthead Three intensity touch pads low medium and high combined with pattern choice produces approximately 3000 fc 32 293 lux to 6000 fc 64 586lux SmallPatterntouchpadproduceslightpatternapproximately5 12 7cm diameter LargePatterntouchpadproduceslightpatternapproximately7 17 ...

Страница 12: ...Lens Swivel Arm Assembly FloorStand Electrical Plug Base with Casters Touch Control Panel Acrylic Lens Yoke Sterile Handle Swivel Arm Assembly Nonsterile Positioning Handle Touch Control Panel Nonsterile Positioning Handle Extension Arm Sterile Handle Yoke Acrylic Lens Off Medium Intensity Low Intensity High Intensity Electronics Power Indicator Filament Failure Indicator Small Pattern Large Patte...

Страница 13: ...e kept to a minimum Incertainneurosurgicalorintestinalproceduresondelicate thin dry or abnormal tissue the user of surgical lights should take care to utilize the lowest possible illumination intensity suitable for the procedure The Amsco Gemini Surgical Lighting System has been designed to provide maximum illumination flexibility and at the same time minimize potentially damaging infrared heat in...

Страница 14: ...ies TheFilamentFailureIndicator showsthatoneofthefilamentsofthedual filament lamp has failed In case of filament failure the electronics will automatically switch power to the remaining good filament Lighthead Movement See Figure 4 Operating This Equipment Lamp Touch Control Panel See Figure 3 WARNING EXPLOSION HAZARD Donotuselighting fixture in the presence of flammableanesthetics CAUTION POSSIBL...

Страница 15: ...tes 360 degrees within its adaptor on extension arm Light fixture moves freely on floor stand casters Vertical suspension tube carriage shaft assembly rotates 360 degrees withincarriage Carriage moves smoothly from one end of track to other Single and Dual Ceiling Mounted Units Floor Stand Mounted Units Track Mounted Units Figure 4 LIGHTHEAD MOVEMENTS Single and Dual Ceiling Mount FloorStand Total...

Страница 16: ...4 4 129360 627 OperatorManual Operating Instructions This Page Intentionally Left Blank ...

Страница 17: ...sembly for oil leakage Each inspection 4 0 Units with Centra Hub Mount 4 1 Check each horizontal arm assembly for drift Level mount Each inspection or adjust break as needed 4 2 Check that suspension tube is securely attached to arm Each inspection and support casting refer to Section 5 in Maintenance Manual 5 0 Units with Track Mounting 5 1 Check each suspension arm assembly for lateral drift Eac...

Страница 18: ... all angles of articulation Verify that light moves smoothly and easily and that light does not flicker 7 3 Verify operation through all control intensities Each inspection 7 4 Reinstall any covers removed Check area to ensure Each inspection removal of all materials used during inspection 7 5 Notify Customer that PM inspection is complete Each inspection 1 Inspect power cord and replace if any da...

Страница 19: ...lighthead is cool before touching WARNING PERSONAL IN JURYHAZARD Whenreplac ingorremovinglamp grasp thelampbytheceramicbase and pry from the socket Do not pull on glass portion of lamp as it may break CAUTION POSSIBLE EQUIPMENT DAMAGE Let lamps cool then use cotton gloves or cloth to remove lamptopreventskinoilsfrom contactingglass CAUTION POSSIBLE EQUIPMENT DAMAGE Do not touch glass portion of la...

Страница 20: ...E EQUIPMENT DAMAGE Use onlyrecommendedcleaning disinfectingand orantistatic agents on this light Some degree of staining pitting and or discoloration could occur if a phenolic lodophor orglutaraldehyde based disinfectant is used on the surfaces of this light Also use of alcohol or aero sol spray cleaner disinfec tants e g Lysol Reckitt Colman containing a sub stantialamountofalcoholin the formula ...

Страница 21: ...xcess solution from cloth before wipingsurfaces 3 Wipe the following areas SuspensionArm Wipeentiresuspensionarm includingsuspensionfork and yoke Lighthead WipeTouchControlPanelandalltopandsidesurfacesofthe lighthead 4 Wipe all surfaces with a dry fresh cloth 1 Remove sterile handle 2 Wipelensuntilcleanwithasoftclothandacommerciallyavailableantistatic acryliccleaner NOTE Do not reinstall sterile h...

Страница 22: ...5 6 129360 627 OperatorManual Operating Instructions This Page Intentionally Left Blank ...

Страница 23: ...ange pattern size Lamp filament burned out a Check yellow filament failure LED Change bulb if needed b Call Service 4 Cannot change intensity Internal light part failure a Call Service 5 Light flickers Bad lamp or lamp not seated properly a Check lamp replace or reseat if needed b Call Service 6 Poor light intensity Bad lamp or dirty optics a Check lamp replace if needed b Clean optics lens reflec...

Страница 24: ...6 2 129360 627 OperatorManual Operating Instructions This Page Intentionally Left Blank ...

Страница 25: ...fynoburntsocketcontactsinlampsocketandelectricalconnector replace lampholder assembly if damaged c Verify no heavy corrosion or pitting is present replace lampholder assembly if damaged d Verify lamp is not discolored or damaged replace if necessary e Verifythereisnoinsulationdamageorfrayingofwiresleadingtosocket assembly replace lampholder if necessary 4 Check that lampholder cap and thermal insu...

Страница 26: ... Excessiveforce 10lbs 4 5kg ormoreasmeasuredatsterilehandle is not required to move lighthead 2 If adjustment is necessary contact qualified service representative 1 Check that floor stand casters are not bent or cracked and move freely replace if necessary 2 Check that support tube fastening bolt is tight tighten to 40 50 lbs ft 59 5 74 4 kgs m torque if necessary Check Lighthead Rotation Frictio...

Страница 27: ...rvicerepresentativeto check the trolley duct 6 Rotate suspension arm lighthead assembly 360 degrees and verify that vertical suspension tube carriage shaft assembly rotates smoothly within carriage with no loss of electrical contact 7 Turn light fixture OFF Check Track Mounted Units See Figure 10 Figure 10 CHECK TRACK MOUNTED UNITS Verify Carriage Moves Freely on Track Check Two Drive Rivets Verif...

Страница 28: ... Ceiling and Floor Stand Mounted Units P 150824 966 Installation Instructions Track Mounted Units P 129360 647 UncratingInstructions P 129360 650 MaintenanceManual P 764322 447 EquipmentDrawings PartNubmer Single Ceiling Mount P 129360 635 Dual Ceiling Mount P 129360 202 24 VAC Isolation Transformer P 129360 206 Floor Stand Units P 129360 201 54 Surface Mounted Track Units P 129360 746 54 Recess M...

Отзывы: