L0190D
14
VENDOR PREPARATION
Inspection
Inspect the vendor carefully for shipping damage prior to signing
the carrier’s delivery receipt. Check for dents on the top or sides
of the vendor, bent legs, broken glass, or other damage on the
exterior of the machine. Check the interior for components that
may have been knocked loose or have sustained other damage.
To improve safety and to provide maximum protection for the
machine and levelling legs, it is recommended that you use the
supplied shipping boards whenever transporting the machine.
Mounting and Connecting Bill Validators and Card Readers
The AMS vendor will support any NAMA-approved Multi-Drop
Bus (MDB) bill validator or card reader. Please read the device
manufacturer’s literature before proceeding.
1.
Open the main door and turn the Power Switch
OFF.
2. See
Figure 4.1
to the right.
3. If installing an up stacking validator, it must be
placed in the lower MDB opening as shown.
4. Remove the four nuts that retain the steel cover
panel. Remove the steel cover panel, then press
out the plastic cover panel in the escutcheon.
5. There is a plastic “wedge” piece included. If your
validator has no bill box offset built in, this wedge
will be needed to tip the validator slightly off-angle
so that the bill box will clear the keypad. If your
validator clears the keypad, this wedge is not
required.
6. Refer to the manufacturer’s literature for
instructions on accessing the mounting holes in
your device. Place the mounting holes over the
threaded studs and reinstall the nuts. Some devices
may require spacers, which are available from AMS
(Part Number 20258).
7. There are slots in the dashboard extension panel to
allow access to the upper-inside nut.
8. This same procedure is used to mount a down
stacking validator or cashless device in the upper
MDB opening.
9. The uppermost MDB opening, shipped with the
lighted POS Display installed, can also be used for
an MDB device although this position is above the
maximum height allowed by the ADA Rules.
Mounting and Connecting Coin Changer
The AMS vendor will support any NAMA-approved Multi-Drop
Bus (MDB) Coin Changer. On some export models, Executive-
type Changers are supported as well. Please read the
manufacturer’s literature before proceeding.
1.
Open the main door and turn the Power Switch
OFF.
2. See
Figure 4.1
to the right.
3. Lift up slightly on the latch release, and swing the
mounting bracket out to expose the mounting
screws.
4. Install the changer by placing the large round
opening at the bottom of each slot over a screw
head. Be careful to keep any wiring harnesses in
this area out of the way. Once each of the round
openings are over the screw heads, the changer is
lowered to engage the narrow portion of the slot
with the shank of each screw.
5. Tighten the mounting screws (reference
manufacturer’s literature).
6. Swing the bracket back to the mounting panel and
secure the latch in the engagement slot.
7. Adjust the coin chute as required to align the chute
with the changer.
Connecting Cashless Devices
1.
Open the main door and turn the Power Switch
OFF.
2. See
Figure 4.1
below.
3. Remove the four nuts that retain the steel cover
panel. Remove the steel cover panel, then press
out the plastic cover panel in the escutcheon.
4. Refer to the manufacturer’s literature for
instructions on accessing the mounting holes in
your device. Place the mounting holes over the
threaded studs and reinstall the nuts. Some devices
may require spacers, which are available from AMS
(Part Number 20258).
5. Connect the Card Reader (if present), directly to the
lighted P.O.S. Harness - then the Bill Validator (if
present) and finally the coin changer. Note that the
changer has no continuation connector, so it must
always be the last device connected.
6. Turn the Power Switch ON
Figure 4.1 Installing Payment Devices
4
VENDOR
PREPARATION
AND
INSTALLATION
Содержание EPIC SENSIT 3
Страница 12: ...L0190D 6 THIS PAGE INTENTIONALY LEFT BLANK ...
Страница 18: ...L0190D 12 THIS PAGE INTENTIONALLY LEFT BLANK ...
Страница 26: ...L0190D 20 THIS PAGE INTENTIONALLY LEFT BLANK ...
Страница 44: ...L0190D 38 THIS PAGE INTENTIONALLY LEFT BLANK ...
Страница 45: ...L0190D 39 Epic Model 9 WIRING DIAGRAM Note Transformer part numbers are forma ed as 120 V 220V ...
Страница 46: ...L0190D 40 THIS PAGE INTENTIONALLY LEFT BLANK ...
Страница 50: ...L0190D 44 THIS PAGE INTENTIONALLY LEFT BLANK ...
Страница 52: ...L0190D 46 THIS PAGE INTENTIONALLY LEFT BLANK ...