![Amada ML-2550A Скачать руководство пользователя страница 184](http://html1.mh-extra.com/html/amada/ml-2550a/ml-2550a_operation-manual_2915851184.webp)
184
ML-2550A/2551A
2. Maintenance of the Cooler Unit Section
3
Installing the Ion-Exchanger
(1) Insert the ion-exchanger and turn it clockwise with the mounting/removing tool.
<Note>
Use the mounting/removing tool for installing the ion-exchanger. If the mounting/
removing tool is too tightened, the thread portion may be broken.
(2) Put cooling water up to the line under HIGH of the water level label with the
attached water feed pump.
(3) Float the floating panel on the water surface in the tank as it was and install the
lid of the cooling water tank.
⇒
The floating panel can be repeatedly used. Because its material is polyethylene
foam, dispose of the floating panel properly.
⇒
If the ion-exchanger is used without the floating panel in the tank, the ion-
exchange resin will be deteriorated more quickly. Be sure to put the floating
panel into the tank.
Содержание ML-2550A
Страница 1: ...AA06M0642E 37 OPERATION MANUAL YAG LASER WELDER ML 2550A 2551A...
Страница 19: ...Introduction Part...
Страница 20: ......
Страница 37: ...Installation and Preparation Part...
Страница 38: ......
Страница 46: ......
Страница 57: ...Operating Part...
Страница 58: ......
Страница 116: ......
Страница 144: ......
Страница 168: ......
Страница 173: ...Maintenance Part...
Страница 174: ......
Страница 203: ...Appendixes...
Страница 204: ......