4. Commands
155
ML-2550A/2551A
Chapter 5 Laser W
elding by External Communication Control (RS-485 CONTROL)
Introduction Part
Operating Part
Maintenance Part
Appendixes
Installation
and
Preparation
Part
Set Value/Monitor Value Table
⇒
The items marked * are monitor values. These values can be read out but
cannot be set.
⇒
The value in ( ) indicates the unit.
⇒
The unit of time setting depends on the setting of "7" of SWITCH 1 on the
MEMORY SWITCH screen. When setting to ON, set the values in increment of 5.
99 Settings for the Cooler
(Set the schedule No. [SH1/SH0] to 00.)
Data No.
Item
Data Range
01*
Coolant temperature
000 – 999 (×1°C)
02
[REF TEMP] on the [INITIALIZE] screen
Control temperature
00 – 99 (×1°C)
03
[HIGH] of ALARM on the [INITIALIZE] screen
Coolant temperature high alarm
00 – 99 (×1°C)
04
[LOW] of ALARM on the [INITIALIZE] screen
Coolant temperature low alarm
00 – 99 (×1°C)
05*
Coolant resistivity
000 – 999 (×0.01MΩ)
84 Schedule Settings for both FIX and FLEX
Data No.
Item
Data Range
01
[FORM] on the [SCHEDULE] screen
Selection of waveform setting method
0: FIX 1: FLEX
0 – 1
02
Set waveform display on the [SCHEDULE]
screen
0: OFF 1: ON
0 – 1
03
[PEAK POWER] on the [SCHEDULE] screen
Laser output peak value
ML-2550A: 0000 – 0800 (×0.01kW)
ML-2551A: 0000 – 0500 (×0.01kW)
04
[REPEAT] on the [SCHEDULE] screen
Pulse repetition rate
000 – 500
05
[SHOT] on the [SCHEDULE] screen
Number of consecutive shots
0000 – 9999
06
[HIGH] on the [MONITOR] screen
Energy monitor upper limit setting
0000 – 9999 (×0.1J)
07
[LOW] on the [MONITOR] screen
Energy monitor lower limit setting
0000 – 9999 (×0.1J)
08
Power monitor waveform display on the
[MONITOR] screen
0: OFF 1: ON
0 – 1
09
[REFERENCE SETTING] on the [MONITOR]
screen
Lamp input power upper limit setting
000 – 100 (×1%)
85 Schedule Settings for FIX
Data No.
Item
Data Range
01
[
SLOPE] TIME on the [SCHEDULE] screen
000 – 999 (×0.1ms/x0.01ms)
Содержание ML-2550A
Страница 1: ...AA06M0642E 37 OPERATION MANUAL YAG LASER WELDER ML 2550A 2551A...
Страница 19: ...Introduction Part...
Страница 20: ......
Страница 37: ...Installation and Preparation Part...
Страница 38: ......
Страница 46: ......
Страница 57: ...Operating Part...
Страница 58: ......
Страница 116: ......
Страница 144: ......
Страница 168: ......
Страница 173: ...Maintenance Part...
Страница 174: ......
Страница 203: ...Appendixes...
Страница 204: ......