WBSn-2400 and WBSn-2450 System Manual
Chapter 2 - Base Station InstallationThe Installation Process
Chapter 2 - Base Station Installation
The Installation Process
11
The typical installation process comprises the following steps:
1
Choose the locations for the outdoor and indoor equipment (refer to
“Location Selection Guidelines”
2
Verify the existence of a good protective grounding (earth) connection near the location intended for
the base station.
3
Prepare the outdoor Ethernet cable and connect it to the base station (refer to
Connecting the Outdoors Ethernet Cable” on page 12
).
4
Prepare the grounding cable and connect it to the base station (refer to
the Grounding Cable” on page 13
).
5
If an extender is required, attach it to the post clamp (refer to
“Attaching an Extender to the Post
).
6
Attach the post clamp (with the extender if applicable) to the pole/wall and attach to it the base
station. Verify that it is properly directed towards the required coverage area (refer to
7
For units with Omni antennas: Connect and seal the three antennas (refer to
Sealing Omni Antennas (if applicable)” on page 17
8
Complete the outdoor installation (refer to
“Completing the Outdoor Installation” on page 17
9
Install and connect the indoor equipment (refer to
“Connecting the Indoor Equipment” on page 18
).
10
Verify that the unit can be remotely managed (refer to
Содержание 43222600
Страница 1: ...System Manual WBSn 2400 and WBSn 2450 Software Version 2 0 June 2015 P N 216066...
Страница 11: ...Chapter 1 Introduction In This Chapter WBSn System Description on page 2 Specifications on page 3...
Страница 127: ...Appendix B Preparing Ethernet Cables In this Appendix Preparing the Base Station s Ethernet Cable on page 116...