WBSn-2400 and WBSn-2450 System Manual
Chapter 2 - Base Station InstallationVerification
Chapter 2 - Base Station Installation
Verification
19
2.13
Verification
Disconnect the PC from the IN port of the PoE Injector and connect the IN port to the networking
equipment (that should be configured to provide connectivity from the control center to the base
station). The ability to properly manage the unit from the control center must be verified before leaving
the site.
Содержание 43222600
Страница 1: ...System Manual WBSn 2400 and WBSn 2450 Software Version 2 0 June 2015 P N 216066...
Страница 11: ...Chapter 1 Introduction In This Chapter WBSn System Description on page 2 Specifications on page 3...
Страница 127: ...Appendix B Preparing Ethernet Cables In this Appendix Preparing the Base Station s Ethernet Cable on page 116...