ATEX (Zone 1 and 21 purging system
installation)
212
GasEye Cross Duct SG and MG
Operating instructions, 05/2021
5. Connect 6mm gas pipe (17) into vent enclosure (7) gas input and GasEye
central unit enclosure (1) gas output. Make sure that GasEye central unit gas
inlets are not sealed with plugs.
6. Connect 3x1mm
2
power cable (12) between 6500-type purging controller (5)
(through M16 gland) and GasEye central unit (1). Length of the cable should
be <20m.
Wire color
GasEye central unit terminal
designation
6500 controller
terminal designation
Brown
24 VDC+ (socket number 25 on
host board)
“Enclosure
power
relay” terminal (L+
side)
Blue
24 VDC- (socket number 26 on host
board)
“Enclosure
power
relay” terminal (N-
side)
Green/Yellow
PE Connect to internal grounding
screw
Connect to internal
grounding screw
Table 61. 3x1mm
2
power cable (12) connection (system 6500).
Figure 205. Supply connectors for powering the analyzer.
7. Connect short 2x1mm
2
wire from purging controller internal terminals
designated as “L+” and “N-“ into another ones of “Enclosure power relay”
terminals.
Содержание GasEye
Страница 1: ......
Страница 2: ...Introduction 2 GasEye Cross Duct SG and MG Operating instructions 05 2021...
Страница 4: ...Introduction 4 GasEye Cross Duct SG and MG Operating instructions 05 2021...
Страница 8: ...Introduction 8 GasEye Cross Duct SG and MG Operating instructions 05 2021...
Страница 21: ...Technical data GasEye Cross Duct Operating instructions 05 2021 21 Figure 8 Calibration certificate...
Страница 188: ...WebServer application 188 GasEye Cross Duct SG and MG Operating instructions 05 2021 Figure 180 Alarm parameters window...