IECEx (Zone 2 and 22 purging system
installation)
238
GasEye Cross Duct SG and MG
Operating instructions, 05/2021
8. Connect 3x1.5mm2 cable (8) into purging controller (5) through M20 gland.
Wire
number
Cable wire color
5500 controller terminal
designation
1
Brown
“+”
2
Blue
“-“
3
Yellow/Green
Connect to internal
grounding screw
Table 67. 2x1.5mm2 cable connection (system 5500).
9. Connect short 6mm pipe (14) between GasEye receiver enclosure and tube
(2).
10. Connect short 6mm pipe (16) between GasEye central unit enclosure and tube
(1).
11. Connect 6mm pipe (15) between GasEye receiver tube (2) and GasEye central
unit tube (1).
12. Additional grounding wire may be connected into external grounding screw on
GasEye enclosure. Make sure the wing nut is well screwed on
Содержание GasEye
Страница 1: ......
Страница 2: ...Introduction 2 GasEye Cross Duct SG and MG Operating instructions 05 2021...
Страница 4: ...Introduction 4 GasEye Cross Duct SG and MG Operating instructions 05 2021...
Страница 8: ...Introduction 8 GasEye Cross Duct SG and MG Operating instructions 05 2021...
Страница 21: ...Technical data GasEye Cross Duct Operating instructions 05 2021 21 Figure 8 Calibration certificate...
Страница 188: ...WebServer application 188 GasEye Cross Duct SG and MG Operating instructions 05 2021 Figure 180 Alarm parameters window...