ATEX (Zone 1 and 21 purging system
installation)
220
GasEye Cross Duct SG and MG
Operating instructions, 05/2021
Figure 214. Powering the purge controller.
9. Connect 6mm pipe (16) between GasEye receiver enclosure (2) and GasEye
transmitter enclosure (1). This pipe should be at least 10m long (and not longer
than 50m) to satisfy proper pressure/flow conditions.
10. Connect 6mm gas pipe (17) between GasEye transmitter enclosure (1) and
GasEye central unit (3). This pipe should be shorter than 3m.
11. Connect grounding cable with ring terminal into internal grounding screw inside
GasEye central unit enclosure (PE wire from GasEye ‘customer cable’ (5)).
Make sure the wing nut is well screwed on.
Figure 215 Grounding terminal central unit Multi Gas.
Содержание GasEye
Страница 1: ......
Страница 2: ...Introduction 2 GasEye Cross Duct SG and MG Operating instructions 05 2021...
Страница 4: ...Introduction 4 GasEye Cross Duct SG and MG Operating instructions 05 2021...
Страница 8: ...Introduction 8 GasEye Cross Duct SG and MG Operating instructions 05 2021...
Страница 21: ...Technical data GasEye Cross Duct Operating instructions 05 2021 21 Figure 8 Calibration certificate...
Страница 188: ...WebServer application 188 GasEye Cross Duct SG and MG Operating instructions 05 2021 Figure 180 Alarm parameters window...