
ATEX (Zone 1 and 21 purging system
installation)
GasEye Cross Duct
Operating instructions, 05/2021
211
Figure 203. Internal grounding terminal in purge controller.
4. Connect vent pressure and flow signal cable (10) into purging controller (5)
through one of the M12 glands. Other end of the cable connects into threaded
gland on vent (7).
Wire
number
Vent cable wire color
6500 controller terminal
designation
1
Brown
“Vent +”
2
Blue
“Vent -“
3
White
“Vent A”
4
Black
“Vent B”
5
Black with ring terminal
Connect to grounding
screw
Table 60. Vent pressure and flow signal cable connection (system 6500).
Figure 204. Vent connectors – controller side.
Содержание GasEye
Страница 1: ......
Страница 2: ...Introduction 2 GasEye Cross Duct SG and MG Operating instructions 05 2021...
Страница 4: ...Introduction 4 GasEye Cross Duct SG and MG Operating instructions 05 2021...
Страница 8: ...Introduction 8 GasEye Cross Duct SG and MG Operating instructions 05 2021...
Страница 21: ...Technical data GasEye Cross Duct Operating instructions 05 2021 21 Figure 8 Calibration certificate...
Страница 188: ...WebServer application 188 GasEye Cross Duct SG and MG Operating instructions 05 2021 Figure 180 Alarm parameters window...