Agilent Intuvo 9000 GC Installation
Install filters and traps, then purge.
47
47
Leak test all connections and set source pressures.
49
Vent hazardous gases to a fume hood.
51
Connect cryogenic cooling (if present).
Connecting liquid carbon dioxide
53
Connecting air to the multimode inlet
Connect valve actuator air (if present).
58
59
61
61
GC / MS / Agilent data system / ALS
Additional cabling configurations
62
63
Install tray bracket onto the tray (7693A only)
Install the tray on the GC (7693A only)
65
67
Calibrate the tray, if installed
Install the Intuvo chips and column.
70
71
Install the Intuvo inlet chip and Guard chip
78
Condition the column and bake out the detector.
85
Transfer the checkout sample to a screw-top sample vial.
87
Prepare for the next analysis.
90
If appropriate, update firmware.
91
Содержание Intuvo 9000
Страница 1: ...Agilent Technologies Agilent Intuvo 9000 Gas Chromatograph Installation and First Startup...
Страница 6: ...6 Agilent Intuvo 9000 GC Installation...
Страница 25: ...Installing the GC 1 Agilent Intuvo 9000 GC Installation 25 3 Reinstall the GC covers...
Страница 26: ...26 Agilent Intuvo 9000 GC Installation 1 Installing the GC Connect the power cord and LAN cable LAN...
Страница 27: ...Installing the GC 1 Agilent Intuvo 9000 GC Installation 27 Turn on the GC...
Страница 29: ...Installing the GC 1 Agilent Intuvo 9000 GC Installation 29...
Страница 52: ...52 Agilent Intuvo 9000 GC Installation 1 Installing the GC Detector cover Vent chimney Screw O Ring...
Страница 84: ...84 Agilent Intuvo 9000 GC Installation 1 Installing the GC 8 Close the GC front door...
Страница 114: ...Agilent Technologies...