102
Agilent Intuvo 9000 GC Installation
B
Cabling Diagrams and Remote Start/Stop
Start (Low True)
Request to start run/timetable. Receiver is
any module performing runtime-controlled activities. The 9000
GC requires a pulse duration of at least 500 micro-seconds to
sense a start from an external device.
Start Relay (Contact Closure)
A 120 millisecond contact
closure used as an isolated output to start another device that is
not compatible or connected with APG Remote pin 3.
Stop (Low True)
Request to reach system ready state as soon
as possible (for example, stop run, abort or finish, and stop
injection). Receiver is any module performing
runtime-controlled activities. Normally this line is not
connected, if the GC oven program is used to control the
method
Stop
time.
APG Remote timing diagram
Prepare H
Start H
Stop H
Ready L
W
a
iting for Ready
System Ready
Requeswt for Prepare
System Ready
Not Ready during Prep
Start Requested
Inject cycle started
Injection/Start
Run
Runtime elapsed/Start
Postrun
W
a
iting for Ready
System Ready
L
L
L
H
H
H
Содержание Intuvo 9000
Страница 1: ...Agilent Technologies Agilent Intuvo 9000 Gas Chromatograph Installation and First Startup...
Страница 6: ...6 Agilent Intuvo 9000 GC Installation...
Страница 25: ...Installing the GC 1 Agilent Intuvo 9000 GC Installation 25 3 Reinstall the GC covers...
Страница 26: ...26 Agilent Intuvo 9000 GC Installation 1 Installing the GC Connect the power cord and LAN cable LAN...
Страница 27: ...Installing the GC 1 Agilent Intuvo 9000 GC Installation 27 Turn on the GC...
Страница 29: ...Installing the GC 1 Agilent Intuvo 9000 GC Installation 29...
Страница 52: ...52 Agilent Intuvo 9000 GC Installation 1 Installing the GC Detector cover Vent chimney Screw O Ring...
Страница 84: ...84 Agilent Intuvo 9000 GC Installation 1 Installing the GC 8 Close the GC front door...
Страница 114: ...Agilent Technologies...