74
Agilent Intuvo 9000 GC Installation
1
Installing the GC
chip compression bolt through the top of the GC as shown
below.) See
Figure 13
Loosening the Guard chip compression bolt (split/splitless
inlet shown)
d
Use the torque driver to open the clips that secure the
inlet chip to the bus. See
e
Orient the new inlet chip. Slide the bottom connector of
the inlet chip behind the Smart ID connector wire for the
detector chip, and insert the bottom connector into the
column fitting on the bus. Then, insert the top connector
into the pocket in the little bus. See
.
f
Seat the chip's column connector into the column fitting.
g
Check your work. Both click and run connectors should be
centered in their fittings, the chip's connector in the
Intuvo torque
driver shaft
CAUTION
Make sure the connectors are fully seated in the column fitting and
little bus.
Содержание Intuvo 9000
Страница 1: ...Agilent Technologies Agilent Intuvo 9000 Gas Chromatograph Installation and First Startup...
Страница 6: ...6 Agilent Intuvo 9000 GC Installation...
Страница 25: ...Installing the GC 1 Agilent Intuvo 9000 GC Installation 25 3 Reinstall the GC covers...
Страница 26: ...26 Agilent Intuvo 9000 GC Installation 1 Installing the GC Connect the power cord and LAN cable LAN...
Страница 27: ...Installing the GC 1 Agilent Intuvo 9000 GC Installation 27 Turn on the GC...
Страница 29: ...Installing the GC 1 Agilent Intuvo 9000 GC Installation 29...
Страница 52: ...52 Agilent Intuvo 9000 GC Installation 1 Installing the GC Detector cover Vent chimney Screw O Ring...
Страница 84: ...84 Agilent Intuvo 9000 GC Installation 1 Installing the GC 8 Close the GC front door...
Страница 114: ...Agilent Technologies...