46
Agilent Intuvo 9000 GC Installation
1
Installing the GC
Install filters and traps, then purge.
This section describes the general installation of traps to a
typical GC. Refer to the installation instructions provided with
the traps for more details.
Install traps
1
Determine where you will install the traps in your supply
tubing line.
shows the recommended trap order for
the carrier gas and the recommended locations for On/Off
valves. See also the
Site Preparation Guide
.
Figure 6
Plumbing the gas supplies
2
Cut the tubing to length with a tubing cutter.
3
Connect the traps and tubing. On/Off valves are not
essential, but are very useful when a tank or trap must be
changed. (If purchasing Agilent compliance services, install
an on/off valve for the inlet gas supply.)
Tank valve
Gas supply
Two-stage regulator
Gas Clean Filter
system
On/Off valve
On/Off valve
Содержание Intuvo 9000
Страница 1: ...Agilent Technologies Agilent Intuvo 9000 Gas Chromatograph Installation and First Startup...
Страница 6: ...6 Agilent Intuvo 9000 GC Installation...
Страница 25: ...Installing the GC 1 Agilent Intuvo 9000 GC Installation 25 3 Reinstall the GC covers...
Страница 26: ...26 Agilent Intuvo 9000 GC Installation 1 Installing the GC Connect the power cord and LAN cable LAN...
Страница 27: ...Installing the GC 1 Agilent Intuvo 9000 GC Installation 27 Turn on the GC...
Страница 29: ...Installing the GC 1 Agilent Intuvo 9000 GC Installation 29...
Страница 52: ...52 Agilent Intuvo 9000 GC Installation 1 Installing the GC Detector cover Vent chimney Screw O Ring...
Страница 84: ...84 Agilent Intuvo 9000 GC Installation 1 Installing the GC 8 Close the GC front door...
Страница 114: ...Agilent Technologies...