Installing the GC
1
Agilent Intuvo 9000 GC Installation
47
Connect gases to the GC.
Plumb to EPC flow modules
Purge the supply lines for a few minutes before connecting them
to the GC flow modules.
If sharing carrier gas between an inlet and a detector, we
recommend using a Tee fitting that includes shutoff valves for
performing leak tests.
Figure 7
Example Tee with shutoff valves
Carrier gas
Detector gases
33 mm = ~ 1 5/16 inches
33 mm = ~ 1 5/16 inches
60 mm = ~ 2 1/4 inches
Содержание Intuvo 9000
Страница 1: ...Agilent Technologies Agilent Intuvo 9000 Gas Chromatograph Installation and First Startup...
Страница 6: ...6 Agilent Intuvo 9000 GC Installation...
Страница 25: ...Installing the GC 1 Agilent Intuvo 9000 GC Installation 25 3 Reinstall the GC covers...
Страница 26: ...26 Agilent Intuvo 9000 GC Installation 1 Installing the GC Connect the power cord and LAN cable LAN...
Страница 27: ...Installing the GC 1 Agilent Intuvo 9000 GC Installation 27 Turn on the GC...
Страница 29: ...Installing the GC 1 Agilent Intuvo 9000 GC Installation 29...
Страница 52: ...52 Agilent Intuvo 9000 GC Installation 1 Installing the GC Detector cover Vent chimney Screw O Ring...
Страница 84: ...84 Agilent Intuvo 9000 GC Installation 1 Installing the GC 8 Close the GC front door...