2
Power Meter Operation
38
E4418B Power Meter User’s Guide
T7
Time between input detection and start of zero/cal
cycle. This is determined by the number of averages
x sample rate or if there is an existing zero/cal
operation in progress, the time for this current
operation to complete. Note that the worst case is
1024 averages x 50 ms = 51.2 s. For front panel
operation (in free run mode) the time is 1 x 50 ms.
4 s
T8
Time for cal operation to complete.
Cal: 6 s (8480 Series)
7 s (E-Series)
9 s (N8480 Series exclude
Option CFT)
6 s (N8480 Series with Option
CFT)
All timings based on 100 ms firmware polling.
If both TTL inputs are simultaneously low under any circumstances other than those shown
above, the operation is undefined.
Table 2-4
TTL Inputs Timing Diagram 2
Содержание E4418B
Страница 1: ...Agilent Technologies Agilent E4418B Power Meter User s Guide ...
Страница 14: ...xiv E4418B Power Meter User s Guide THIS PAGE HAS BEEN INTENTIONALLY LEFT BLANK ...
Страница 20: ...xx E4418B Power Meter User s Guide THIS PAGE HAS BEEN INTENTIONALLY LEFT BLANK ...
Страница 22: ...xxii E4418B Power Meter User s Guide THIS PAGE HAS BEEN INTENTIONALLY LEFT BLANK ...
Страница 24: ...xxiv E4418B Power Meter User s Guide THIS PAGE HAS BEEN INTENTIONALLY LEFT BLANK ...
Страница 47: ...Power Meter Operation 2 E4418B Power Meter User s Guide 23 Contacting Agilent Technologies on page 103 ...
Страница 113: ...Power Meter Operation 2 E4418B Power Meter User s Guide 89 Figure 2 21 Save Recall Screen ...
Страница 126: ...2 Power Meter Operation 102 E4418B Power Meter User s Guide Figure 2 23 Replacing the fuse In line fuse Spare fuse ...
Страница 168: ...3 Menu Reference 144 E4418B Power Meter User s Guide THIS PAGE HAS BEEN INTENTIONALLY LEFT BLANK ...
Страница 169: ...145 E4418B Power Meter User s Guide Agilent Technologies 4 Error Messages Introduction 146 Error Messages 148 ...