
assembly
replacement,
14-2
tools
for
service,
1-1
transmission
tracking
characteristics
type-N
test
port
(50),
2-7
type-N
test
port
(75),
2-8
transmission
tracking
(E
T
),
11-19
TROUBLE!
CHECK
SETUP
AND
ST
ART
O
VER,
10-63
troubleshooting
1st
LO
signal
at
sampler/mixer,
8-12
A10
by
substitution
or
signal
examination,
8-8
A11
phase
lock,
7-37
A11
phase
lock
and
A3
source
check,
7-8
A12
reference,
7-13
A13/A14
Fractional-N,
7-24
A14
Divide-by-N
Circuit
Check,
7-29
A15
preregulator,
5-9
A1/A2
front
panel,
6-7
A7
pulse
generator,
7-33
accessories,
9-1
broadband
power
problems,
7-40
diagnostics,
4-3
digital
control,
6-1
disk
drive,
4-8
fan,
5-22
faulty
group
identication,
4-10
front
panel,
6-7
HP-IB
systems,
4-7
one
or
more
inputs
look
good,
8-11
phase
lock
error,
7-4
plotters
or
printers,
4-8
receiver,
8-1
self-test,
4-3
source,
7-1
systems
with
controllers,
4-9
systems
with
multiple
peripherals,
4-9
when
all
inputs
look
bad,
8-7
Y
O
coil
drive
check
with
analog
bus,
7-11
troubleshooting
power
supply,
5-1
troubleshooting
source
group
appendix,
7-39
U
uncertainty
measurement,
2-4
measurement
window,
2-4
uncorrected
performance,
11-9
USE
SENSOR
A/B,
10-6
V
variable
fan
circuit,
12-8
V
CO
(A14)
exercise,
7-28
V
CO
range
check
frequencies,
7-24
verication
kit
7
mm,
1-3
verify
calibration
kit
devices,
9-4
vertical
position
and
focus
adjustments,
3-43
voltage
indications
post
regulator,
12-8
voltages
A15
preregulator
check,
5-9
A19
GSP,
6-14
A8,
5-14
display
power
supply,
6-13
fan,
5-22
front
panel
probe
power,
5-19
Y
O0
and
Y
O+
coil
drive
voltage
dierences
with&
SOURCE
PLL
OFF,
7-13
voltages
for
post
regulator,
5-5
voltmeter,
1-3
VRAM
bank.,
10-16
VRAM/video,
10-16
W
walking
one
pattern,
6-16
Index-21
Содержание 8752C
Страница 22: ...Before Applying Power 15 6 Servicing 15 6 Index Contents 16 ...
Страница 38: ......
Страница 43: ...Figure 2 1 Measurement Uncertainty Window System Veri cation and Performance Tests 2 5 ...
Страница 80: ...Figure 2 15 Magnitude Dynamic Accuracy Test Setup 2 42 System Veri cation and Performance Tests ...
Страница 116: ......
Страница 122: ...Figure 3 1 Location of Major Assemblies 3 6 Adjustments and Correction Constants ...
Страница 176: ......
Страница 192: ...4 16 Start Troubleshooting Here ...
Страница 193: ......
Страница 194: ...Figure 4 7 HP 8752C Overall Block Diagram 2 of 4 Option 003 and 004 Start Troubleshooting Here 4 19 ...
Страница 195: ...Figure 4 7 HP 8752C Overall Block Diagram 3 of 4 Option 006 4 20 Start Troubleshooting Here ...
Страница 196: ...Figure 4 7 HP 8752C Overall Block Diagram 4 of 4 Option 004 and 006 Start Troubleshooting Here 4 21 ...
Страница 197: ......
Страница 221: ...5 24 Power Supply Troubleshooting ...
Страница 222: ......
Страница 225: ...Digital Control Group Block Diagram Figure 6 1 Digital Control Group Block Diagram Digital Control Troubleshooting 6 3 ...
Страница 267: ...Figure 7 18 25 MHz HI OUT Waveform from A14J1 Figure 7 19 60 MHz HI OUT Waveform from A14J1 Source Troubleshooting 7 27 ...
Страница 271: ...Figure 7 21 A14 Generated Digital Control Signals Source Troubleshooting 7 31 ...
Страница 301: ...Figure 9 2 Typical Smith Chart Traces of Good Short a and Open b Accessories Troubleshooting 9 7 ...
Страница 302: ......
Страница 366: ......
Страница 378: ...Figure 11 4 Typical ED Re ection Test Port 11 12 Error Terms ...
Страница 380: ...Figure 11 5 Typical ES Re ection Test Port 11 14 Error Terms ...
Страница 382: ...Figure 11 6 Typical ER Re ection Test Port 11 16 Error Terms ...
Страница 384: ...Figure 11 7 Typical EX with 10 Hz Bandwidth Figure 11 8 Typical EX with 3 kHz Bandwidth 11 18 Error Terms ...
Страница 386: ...Figure 11 9 Typical ET 11 20 Error Terms ...
Страница 407: ...Figure 12 5 High Band Operation of the Source Theory of Operation 12 21 ...
Страница 410: ...Figure 12 6 Receiver Functional Group standard and Option 003 12 24 Theory of Operation ...
Страница 411: ...Figure 12 7 Receiver Functional Group Option 003 and 004 Theory of Operation 12 25 ...
Страница 412: ...Figure 12 8 Receiver Functional Group Option 006 12 26 Theory of Operation ...
Страница 413: ...Figure 12 9 Receiver Functional Group Option 004 and 006 Theory of Operation 12 27 ...
Страница 416: ......
Страница 419: ...Figure 13 1 Module Exchange Procedure Replaceable Parts 13 3 ...
Страница 423: ...Major Assemblies Replaceable Parts 13 7 ...
Страница 425: ...Front Panel Assemblies Replaceable Parts 13 9 ...
Страница 427: ...Rear Panel Assemblies Replaceable Parts 13 11 ...
Страница 429: ...Cables Top View Replaceable Parts 13 13 ...
Страница 431: ...Front Panel Cables and Attaching Hardware Replaceable Parts 13 15 ...
Страница 433: ...Rear Panel Cables and Attaching Hardware Replaceable Parts 13 17 ...
Страница 435: ...Source and Sampler Parts Standard and Option 003 Replaceable Parts 13 19 ...
Страница 437: ...Source and Sampler Parts Option 004 006 Replaceable Parts 13 21 ...
Страница 439: ...Source and Sampler Parts Options 004 and 003 004 Replaceable Parts 13 23 ...
Страница 441: ...Source and Sampler Parts Option 006 Replaceable Parts 13 25 ...
Страница 443: ...Display Bezel Assembly Replaceable Parts 13 27 ...
Страница 445: ...Chassis Parts Replaceable Parts 13 29 ...
Страница 447: ...Top View of Attaching Hardware and Post Regulator Fuses Replaceable Parts 13 31 ...
Страница 449: ...Bottom View of Attaching Hardware Replaceable Parts 13 33 ...
Страница 488: ......