Maintenance
10
N1911A/1912A P-Series Power Meters User’s Guide
231
and measured internally. A pass or fail result is returned.
Display
Three tests are available for the display: the display assembly, display
RAM and bitmap display.
A read/write is performed on the display RAM. If the value which is
written is read back correctly, a pass is recorded, otherwise a fail is
recorded.
The liquid crystal display/ light emitting diode (LCD/LED) control circuits
are tested by making separate voltage measurements via the multiplexer
and digital signal processor. If the expected voltages are measured, a pass
is recorded, otherwise a fail is recorded. The three circuits tested are the
LCD contrast control, the LED brightness control, and the display
temperature sensing diode.
Содержание 1912A
Страница 1: ...Agilent Technologies Agilent N1911A 1912A P Series Power Meters User s Guide...
Страница 9: ...N1911 1912A P Series Power Meters User s Guide ix Out position of bi stable push control...
Страница 24: ...xxiv N19121A 1912A P Series Power Meters User s Guide THIS PAGE HAS BEEN INTENTIONALLY LEFT BLANK...
Страница 26: ...xxvi N19121A 1912A P Series Power Meters User s Guide THIS PAGE HAS BEEN INTENTIONALLY LEFT BLANK...
Страница 278: ...10 Maintenance 252 N1911A 1912A P Series Power Meters User s Guide THIS PAGE HAS BEEN INTENTIONALLY LEFT BLANK...