
CONTINUOUS-FLOW GRAIN DRYER – COMMANDER CONTROL
6
7713397 R2
4.5.2 Assembly Hardware Key........................................................................................... 36
4.5.3 Roof Systems ............................................................................................................ 37
4.5.4 Catwalk and Safety Cage Assembly ......................................................................... 44
4.5.5 Safety Cage Assembly .............................................................................................. 53
4.6.1 Position Lower Dryer Section at Location................................................................ 54
4.6.2 Install NECO Leg Kit ................................................................................................. 54
4.6.3 Anchor Lower Section to Pad/Foundation .............................................................. 59
4.6.4 Anchor Bottom Platform.......................................................................................... 60
4.6.5 Stack and Secure Sections........................................................................................ 61
4.6.6 Install NECO Logo Bracket........................................................................................ 70
4.6.7 Install the Cross Auger or Cross Drag....................................................................... 71
4.6.8 Install the Blower Motor VFDs (Optional) ............................................................... 76
4.7.1 Adjust Control Box Height........................................................................................ 79
4.7.2 Final Electrical Hookup............................................................................................. 79
4.7.3 Blower Motor Wire(s) .............................................................................................. 80
4.7.4 Install the Dual Thermocouple Probe ...................................................................... 82
4.7.5 Install Burner Box Cables* ....................................................................................... 82
4.7.6 Install the Fill Switch and Low Switch ...................................................................... 83
4.7.7 Install Moisture/Temperature Sensors .................................................................... 86
4.7.8 Install the Discharge Chute Cables........................................................................... 88
4.7.9 Install Wet Bin Empty and Dry Bin Full Switches (Optional) ................................... 89
4.7.10 HMI Wiring Connections ........................................................................................ 90
4.7.11 Final Fuel Supply Hookup....................................................................................... 92
4.7.12 External Transport(s).............................................................................................. 97
4.7.13 Commander Control Setup .................................................................................... 99
5.1 Standard Model Specifications ............................................................................................. 100
5.2 Wind Load.............................................................................................................................. 101
5.3 Dryer Weight Data................................................................................................................. 103
5.4 Utility Layout and Weight Load Points ................................................................................. 104
6.1.1 16' Dryer Sections – 4-8 Tiers ................................................................................ 111
6.1.2 16' Dryer Sections – 10-16 Tiers ............................................................................ 112
6.1.3 24' Dryer Sections – 6-12 Tiers .............................................................................. 112
6.1.4 24' Dryer Sections – 14-24 Tiers ............................................................................ 113
6.1.5 32' Dryer Sections .................................................................................................. 114
6.2 Main Control Box Terminal Strip........................................................................................... 115
6.3 Wiring External Transports ................................................................................................... 116
6.4 Wiring NEMA Starters / IEC Starters / Air Systems............................................................... 117
6.5 Optional Unload Motor VFD ................................................................................................. 118
Содержание NECO D16106
Страница 2: ......
Страница 4: ...4 7713397 R2 CONTINUOUS FLOW GRAIN DRYER COMMANDER CONTROL...
Страница 121: ...7713397 R2 121 CONTINUOUS FLOW GRAIN DRYER COMMANDER CONTROL 8 LIMITED WARRANTY...