
7713397 R2
95
Figure 117.
Vaporizer
040120
040127
Install Vent Pipe Assemblies (CSA Models Only)
1. Vent pipe assemblies are shipped partially broken down for shipping purposes. Reassemble as shown.
2. Connect the vent pipe assemblies to the fuel inlet assemblies on the dryer as shown and secure to the
041015 brackets with the provided ¼" U-bolts and whiznuts. Adjust the level of the brackets as needed to
ensure that the vent pipes are level or sloped slightly in a direction that will allow water to drain.
Figure 118.
Vent Pipe - Bottom Section
041015
079309
CONTINUOUS-FLOW GRAIN DRYER – COMMANDER CONTROL
Содержание NECO D16106
Страница 2: ......
Страница 4: ...4 7713397 R2 CONTINUOUS FLOW GRAIN DRYER COMMANDER CONTROL...
Страница 121: ...7713397 R2 121 CONTINUOUS FLOW GRAIN DRYER COMMANDER CONTROL 8 LIMITED WARRANTY...