
44
7713397 R2
For 32' dryers:
1. Bolt two middle panel assemblies and two corner assemblies together.
2. Atop that, add an assembled 24' dryer assembly.
3. Finish with the top-most pre-assembled 16' section.
4. Add the assembly to the upper-most tier / roof base section.
Figure 32.
Roof with Gravity Fill — 16', 24' or 32'
16'
Gravity
Fill
24'
Gravity
Fill
32'
Gravity
Fill
NOTE:
12’ TOP SECTION
LOOKS VISUALLY THE
SAME, BUT SMALLER.
NOTE:
POSITION FILL SWITCH
TOWARD THE FRONT
OF DRYER.
4.5.4 Catwalk and Safety Cage Assembly
Note
Catwalk systems are only used on models with closed roofs. If the system is NOT either a Roof with
Gravity Fill system, or a Roof with Level Auger system, skip this section.
Do all catwalk and safety cage assembly at ground level.
• The main catwalk parts required per dryer length are outlined in the following table.
• For ease of assembly, note how the various dryer lengths have sections of catwalk making up the required
length along the topside of the dryer.
CONTINUOUS-FLOW GRAIN DRYER – COMMANDER CONTROL
Содержание NECO D16106
Страница 2: ......
Страница 4: ...4 7713397 R2 CONTINUOUS FLOW GRAIN DRYER COMMANDER CONTROL...
Страница 121: ...7713397 R2 121 CONTINUOUS FLOW GRAIN DRYER COMMANDER CONTROL 8 LIMITED WARRANTY...