5.5.3 Install the Wheel
Procedure
1.
Install the replacement wheel.
2.
Install the wheel nuts.
3.
Tighten the wheel nuts by hand.
4.
Lower the machine to the ground with the jack.
5.
Tighten the wheel nuts in the correct sequence (crosswise) with a calibrated torque wrench. Tighten
them in the correct sequence and tighten again to the correct torque.
6.
Make sure that the new tyre is at the correct pressure.
7.
After you move for 1 hour tighten the wheel nuts to the correct torque again.
TASK_0A493F6841E84B0BAF42B0A03640672F [V]
5. Troubleshooting
154
Baler Wrapper Combination
4900.LE.EN01
Содержание LELY RPC 130 F
Страница 2: ......
Страница 8: ...Table of contents 8 Baler Wrapper Combination 4900 LE EN01...
Страница 32: ...1 Safety 32 Baler Wrapper Combination 4900 LE EN01...
Страница 34: ...Table of contents 34 Baler Wrapper Combination 4900 LE EN01...
Страница 110: ...3 Operation 110 Baler Wrapper Combination 4900 LE EN01...
Страница 112: ...Table of contents 112 Baler Wrapper Combination 4900 LE EN01...
Страница 122: ...Danger Zones page 31 4 Maintenance and Lubrication 122 Baler Wrapper Combination 4900 LE EN01...
Страница 148: ...Table of contents 148 Baler Wrapper Combination 4900 LE EN01...
Страница 158: ...Table of contents 158 Baler Wrapper Combination 4900 LE EN01...
Страница 164: ...6 Specifications 164 Baler Wrapper Combination 4900 LE EN01...
Страница 167: ......
Страница 168: ...AGCO Corporation 2018 All rights reserved 4900 LE EN01 English May 2018...