After each 500 bales (or daily)
Position in
figure
Machine part
Lubrication
Note
3
Two grease nipples on the linkage
point of the wrapping table rollers.
(A)
On the two sides of the machine.
4
Grease nipple of the bale transfer.
(A)
On the left hand side of the
machine.
2
Two grease nipples on the linkage
point of the wrapping table
cylinder.
(A)
On the two sides of the machine.
After 3000 bales and before or after the machine is not used for more than 6 weeks
Position in
figure
Machine part
Lubrication
Note
8
Top belt roller.
(A)
On the two sides of the machine,
open the tailgate 1/4 and make sure
that it does not move (RPC 160 V).
8
Central belt rocker roller.
(A)
On the two sides of the machine
bring the belt tensioner in to the
service position, open the tailgate
1/4 and make sure that it does not
move (RPC 160 V).
7
Bottom belt rocker roller.
(A)
On the two sides of the machine
bring the belt tensioner in to the
service position, open the tailgate
1/4 and make sure that it does not
move (RPC 160 V).
5
Joint between the belt rocker and
the hydraulic cylinder.
(A)
On the two sides of the machine
(RPC 160 V).
1
Drive train of the wrapping table.
(A)
On the right side of machine.
At the end of the season annually (in case of special operating conditions also weekly)
Position in
figure
Machine part
Lubrication
Note
13
Main gear unit.
(C) (2.2L)
Oil change.
Check the filling level with a dip stick
or overflow hole.
12
Movable parts of net tying unit.
(D)
To make sure that there is a smooth
movement.
9
Hydraulic cylinder on the tailgate
locking mechanism.
(A)
On the two sides of the machine.
11
Star ratchet in the pick-up drive.
(A)
On the left side of the machine.
4
4. Maintenance and Lubrication
Baler Wrapper Combination
117
4900.LE.EN01
Содержание LELY RPC 130 F
Страница 2: ......
Страница 8: ...Table of contents 8 Baler Wrapper Combination 4900 LE EN01...
Страница 32: ...1 Safety 32 Baler Wrapper Combination 4900 LE EN01...
Страница 34: ...Table of contents 34 Baler Wrapper Combination 4900 LE EN01...
Страница 110: ...3 Operation 110 Baler Wrapper Combination 4900 LE EN01...
Страница 112: ...Table of contents 112 Baler Wrapper Combination 4900 LE EN01...
Страница 122: ...Danger Zones page 31 4 Maintenance and Lubrication 122 Baler Wrapper Combination 4900 LE EN01...
Страница 148: ...Table of contents 148 Baler Wrapper Combination 4900 LE EN01...
Страница 158: ...Table of contents 158 Baler Wrapper Combination 4900 LE EN01...
Страница 164: ...6 Specifications 164 Baler Wrapper Combination 4900 LE EN01...
Страница 167: ......
Страница 168: ...AGCO Corporation 2018 All rights reserved 4900 LE EN01 English May 2018...