4.7 Tighten the Chains of the Wrapper
Before starting the procedure
Adjust the chain tension after the first 1000 bales.
Procedure
1.
Make sure that the machine is "OFF". Refer to the shutdown procedure for maintenance.
2.
Remove the three bolts (1) and the chain
guard (2) from the wrapper table.
3.
Loosen the bolt of the chain tensioner (3).
4.
Push the tensioner against the chain (4) until
the chain has 10 mm of play.
5.
Tighten the bolt of the chain tensioner.
6.
Install the guard with the bolts.
GUID-E27751EE-745E-402C-884B-6E9132095CA2-high.jpg [High]
Fig. 10
7.
Remove the bolts (4) and remove the chain
guard (1) from the wrapper ring.
8.
Release the bolt (2) of the chain tensioner.
9.
Adjust the chain tensioner nut (3).
10.
Make sure that the chain (5) has a play of 5
mm at the shown position.
11.
Tighten the chain tensioner bolt (2).
12.
Install the guard with the bolts.
GUID-05AAA2A2-7E5B-4F0E-8A0B-2204CC8BC68C-high.jpg [High]
Fig. 11
GUID-B373AE2A-B9E7-432E-A1F3-BE695B2E7B1A [V1]
4. Maintenance and Lubrication
126
Baler Wrapper Combination
4900.LE.EN01
Содержание LELY RPC 130 F
Страница 2: ......
Страница 8: ...Table of contents 8 Baler Wrapper Combination 4900 LE EN01...
Страница 32: ...1 Safety 32 Baler Wrapper Combination 4900 LE EN01...
Страница 34: ...Table of contents 34 Baler Wrapper Combination 4900 LE EN01...
Страница 110: ...3 Operation 110 Baler Wrapper Combination 4900 LE EN01...
Страница 112: ...Table of contents 112 Baler Wrapper Combination 4900 LE EN01...
Страница 122: ...Danger Zones page 31 4 Maintenance and Lubrication 122 Baler Wrapper Combination 4900 LE EN01...
Страница 148: ...Table of contents 148 Baler Wrapper Combination 4900 LE EN01...
Страница 158: ...Table of contents 158 Baler Wrapper Combination 4900 LE EN01...
Страница 164: ...6 Specifications 164 Baler Wrapper Combination 4900 LE EN01...
Страница 167: ......
Страница 168: ...AGCO Corporation 2018 All rights reserved 4900 LE EN01 English May 2018...