12
13
A
S
S
E
M
B
LY
STE
P 2
A
Open
HAR
D
W
AR
E FOR STE
P 2
.
B
Att
ac
h the
G
U
IDE RAI
L S
ET
to the
MAI
N F
RAM
E
using 4
BOL
TS (F)
, 4
S
P
R
ING W
AS
H
E
R
S (E)
and 4
F
LA
T
W
AS
H
E
R
S (
D)
.
C
Att
ac
h the
G
U
IDE RAI
L S
ET
to the
INCL
IN
E
B
RA
C
K
ET
using 4
BOL
TS
(G
)
, 4
F
LA
T W
AS
H
E
R
S (
H)
, 4
S
P
R
ING
W
AS
H
E
R
S (
I)
and 4
N
UTS (J)
.
S
PR
IN
G W
AS
H
E
R (E)
15 mm
Qty: 4
FLA
T W
AS
H
E
R (D)
16 mm
Qty: 4
B
OL
T (F)
20 mm
Qty: 4
S
PR
IN
G W
AS
H
E
R (I)
18 mm
Qty: 4
FLA
T
W
AS
H
E
R (H)
20 mm
Qty: 4
B
OL
T (G)
35 mm
Qty: 4
N
UT (J)
Qty: 4
HAR
D
W
AR
E F
OR STE
P 2
:
FLA
T W
AS
H
E
R
S (D)
S
PR
IN
G W
AS
H
E
R
S (E)
B
OL
TS (F)
FLA
T W
AS
H
E
R
S (H)
S
PR
IN
G W
AS
H
E
R
S (I)
N
UTS (J)
G
U
ID
E RAI
L S
ET
IN
CLI
N
E B
RA
CK
ET
MAI
N FRAM
E
B
OL
TS (G)
4
.1
A
E S
H
O
W
N
B
OL
T (O)
S
PR
IN
G W
AS
H
E
R (B)
FLA
T W
AS
H
E
R (K)
W
A
VY W
AS
H
E
R (N)
PE
D
AL AR
M
CRAN
K
PE
D
AL AR
M WH
E
E
L
G
U
ID
E RAI
L
CON
S
OLE MAST
B
OL
TS (L)
CON
S
OLE C
AB
LE
MAI
N FRAM
E
FLA
T W
AS
H
E
R
S (M)
A
S
S
E
M
B
LY
STE
P 3
A
Open
HAR
D
W
AR
E FOR STE
P 3
.
B
Carefully pull the
C
ON
SOL
E C
AB
LE
through
the
C
ON
SOL
E
MAST
using
the
twist
tie
located
inside the
C
ON
SOL
E MAST
.
C
Att
ac
h
C
ON
SOL
E MAST
to
MAI
N F
RAM
E
using 4
F
LA
T W
AS
H
E
R
S (
M
)
and 4
BOL
TS (
L)
.
D
Slide
W
A
V
Y W
AS
H
E
R (
N)
over
CRAN
K
followed by
P
E
D
AL AR
M
as shown. Rest
P
E
D
AL AR
M W
H
E
E
L
on
G
U
IDE RAI
L
.
E
Att
ac
h the
P
E
D
AL AR
M
to the
CRAN
K
using 1
F
LA
T W
AS
H
E
R (
K)
, 1
S
P
R
ING W
AS
H
E
R (B)
and 1
BOL
T (O)
.
F
Repeat steps D–E on the opposite side of the elliptical.
B
OL
T (O)
20 mm
Qty: 2
S
PR
IN
G W
AS
H
E
R (B)
15 mm
Qty: 2
FLA
T W
AS
H
E
R (K)
20 mm
Qty: 2
W
A
VY W
AS
H
E
R (N)
22.5 mm
Qty: 2
FLA
T W
AS
H
E
R (M)
23 mm
Qty: 4
B
OL
T (L)
15 mm
Qty: 4
HAR
DW
AR
E
F
OR STE
P 3
:
N
O
TE
: Be
careful
not
to
pinc
h
any
wires
while
att
ac
hing
the
console
mast.
4
.1
A
E S
H
O
W
N
$(B
$(B
2
0B
5H
Y
B
LQ
GG
$0
Содержание 3.1AE
Страница 74: ...146 147 B B20B5HY B LQGG 0...