Benchmark 750/1000 Boiler Installation, Operation & Maintenance Manual
CHAPTER 6 – SAFETY DEVICE TESTING
Page
88
of
192
AERCO International, Inc.
•
100 Oritani Dr.
•
Blauvelt, NY 10913
OMM-0082_0J
05/21/2014
Ph.: 800-526-0288
GF-130
Ignition Switch Open During Ignition – Continued
Figure 6-7: Air/Fuel Valve Purge and Ignition Switch Locations
6.12 SAFETY PRESSURE RELIEF VALVE TEST
Test the safety Pressure Relief Valve in accordance with ASME Boiler and Pressure Vessel
Code, Section VI.
Ignition Position Switch
Purge Position Switch
AIR IN
TO BLOWER