Benchmark 750/1000 Boiler
Installation, Operation & Maintenance Manual
CHAPTER 2 – INSTALLATION
Page
20
of
192
AERCO International, Inc.
•
100 Oritani Dr.
•
Blauvelt, NY 10913
OMM-0082_0J
05/21/2014
Ph.: 800-526-0288
GF-130
Figure2-4: Pressure Relief Valve Location
2.7 CONDENSATE DRAIN & PIPING
The Benchmark Boiler is designed to condense water vapor from the flue products. Therefore,
the installation must have provisions for suitable condensate drainage or collection.
The condensate drain port located on the exhaust manifold (Figure 2-5) must be connected to
the condensate trap (part no. 24060) which is packed separately within the unit’s shipping
container. The condensate trap inlet and outlet connections contain tapped 3/4” NPT ports.
Figure2-5: Condensate Drain Connection Location
A sample condensate trap installation is shown in Figure 2-6. However, the actual installation
details for the trap will vary depending on the available clearances, housekeeping pad height/
dimensions and other prevailing conditions at the site. The following general guidelines must be
observed to ensure proper condensate drainage:
•
The condensate trap inlet (Figure 2-6) must be level with, or lower than the exhaust
manifold drain port.
•
The base of the condensate trap must be supported to ensure that it is level (horizontal).
•
The trap must be removable for routine maintenance. AERCO recommends that a union
be utilized between the exhaust manifold condensate drain port and the trap inlet port.
DRAIN VALVE
PRIMARY INTLET
EXHAUST
MANIFOLD
ANALYZER
PROBE PORT
CONDENSATE DRAIN
PARTIAL REAR VIEW
PRESSURE
RELIEF VALVE
3” HOT BOILER
WATER OUTLET
P&T GAUGE
COUPLING