Benchmark 750/1000 Boiler
Installation, Operation & Maintenance Manual
CHAPTER 2 – INSTALLATION
OMM-0082_0J
AERCO International, Inc.
•
100 Oritani Dr.
•
Blauvelt, NY 10913
Page
21
of
192
GF-130
Ph.: 800-526-0288
05/21/2014
While observing the above guidelines, install the condensate trap as follows:
Condensate Trap Installation
1.
Connect the condensate trap inlet to the exhaust manifold drain connection using the
appropriate piping components (nipples, reducers, elbows, etc.) for the boiler installation
site.
2.
At the condensate trap outlet, install a 3/4” NPT nipple.
3.
Connect a length of 1” I.D polypropylene hose to the trap outlet and secure with a hose
clamp.
4.
Route the hose on the trap outlet to a nearby floor drain.
If a floor drain is not available, a condensate pump can be used to remove the condensate to an
appropriate drain. The maximum condensate flow rate is 10
GPH. The condensate drain trap,
associated fittings and drain line must be removable for routine maintenance.
Use PVC, stainless steel, aluminum or polypropylene for condensate drain
piping (Figure 2-6). DO NOT use carbon or copper components.
Figure2-6: Sample Condensate Trap Installation
CAUTION
COMBUTION
ANALYZER
PROBE PORT
EXHAUST
MANIFOLD
3/4” NPT
NIPPLE
HOSE
CLAMP
T O
FLOOR
DRAIN
CONDENSATE
TRAP
(P/N 24060)
TRAP INLET
INTEGRAL ADAPTOR AND
THUMBSCREW
TOP COVER
THUMB SREWS
(4 each)
1” DIAM.
HOSE
NOTE
HOUSKEEPING
PAD MUST NOT
EXTEND
UNDER THE
CONDENSATE
ASSEMBLY.
4” MINIMUM
(6” MAXIMUM)
4”
3/4” NPT
NIPPLES
UNION