6.10 PURGE SWITCH OPEN DURING PURGE
The Purge Switch (and Ignition Switch) is located on the Air/Fuel Valve. To check the switch,
proceed as follows:
Purge Switch Open During Purge
1. Set the unit’s
ON/OFF
switch to the
OFF
position. Place the unit in manual mode and set
the valve position between 25% and 30%.
2. Remove the Air/Fuel Valve cover by rotating the cover counterclockwise to unlock it (see
Figure 6-6).
3. Remove one of the two wires (#171 or #172) from the Purge Switch (Figure 6-6).
4. Initiate a unit start sequence.
5. The unit should begin its start sequence, then shut down and display
PRG SWITCH
OPEN DURING PURGE
.
6. Replace the wire on the Purge Switch and depress the
CLEAR
button. The unit should
restart.
Figure 6-6: Air/Fuel Valve Cover Location
6.11 IGNITION SWITCH OPEN DURING IGNITION
The Ignition Switch (and the Purge Switch) is located on the Air/Fuel Valve. To check the
switch, proceed as follows:
Ignition Switch Open During Ignition
1. Set the unit’s
ON/OFF
switch to the
OFF
position.
2. Place the unit in Manual Mode and set the valve position between 25% and 30%.
3. Remove the Air/Fuel Valve cover (Figure 6-6) by rotating the cover counterclockwise to
unlock and lift up to remove.
4. Remove one of the two wires (#169 or #170) from the Ignition Switch (Figure 6-7).
5. Initiate a unit start sequence.
6. The unit should begin its start sequence and then shut down and display
IGN SWITCH
OPEN DURING IGNITION.
7. Replace the wire on the Ignition Switch and press the
CLEAR
button. The unit should
restart.
AIR/FUEL VALVE COVER
(Rotate counter-clockwise
to remove)