AC terminal block
Grounding stud
Figure 4‑12. 600 series AC terminal block
AC terminal block
Grounding stud
Figure 4‑13. 1000 series AC terminal block
3. Connect the AC EGC to one of the AC terminals marked
GND
.
☞
Important
Use only one of the
GND
connections on the AC terminal block. The
second
GND
must remain empty.
AC GND
AC GND
L1
L2
L3
N
Figure 4‑14. AC terminals
Advanced Energy
4‑26
Installing
570-1003552-05A
Содержание AE 3TL 1000 Series
Страница 2: ......
Страница 12: ...Advanced Energy xii 570 1003552 05A List of Tables...
Страница 14: ...Advanced Energy xiv 570 1003552 05A List of Figures...
Страница 26: ...Advanced Energy 1 12 Safety and Product Compliance Guidelines 570 1003552 05A...
Страница 64: ...Advanced Energy 4 28 Installing 570 1003552 05A...
Страница 86: ...Advanced Energy 6 4 Operating the Arc Fault Detection Unit 570 1003552 05A...
Страница 92: ...Advanced Energy 7 6 Data Monitoring and Controls 570 1003552 05A...
Страница 110: ...Advanced Energy 9 14 Troubleshooting and Solar Energy Technical Support 570 1003552 05A...
Страница 116: ...Advanced Energy A 6 Specifications 570 1003552 05A...
Страница 118: ...Figure 11 2 AE 3TL mechanical diagram Advanced Energy B 2 System and Mechanical Diagrams 570 1003552 05A...
Страница 120: ...Advanced Energy B 4 System and Mechanical Diagrams 570 1003552 05A...