To Connect to the DC Input Terminals
1. Determine the appropriate size of the DC conductors using the following table.
Terminals are rated for the maximum wire size listed in the following table. An
electrician should determine the appropriate wire size for your installation.
Table 4‑3. DC conductor sizing
Conductor
Conductor Size: All AE 3TL Models
Positive/negative (from multi-
string array)
12 AWG to 8 AWG Cu
2. Ensure that the DC disconnect switch is in the
OFF
position.
3. Open the connection box cover.
4. Check the polarity of the DC home runs at the connection point to ensure
proper polarity.
☞
Important
The AE AE 3TL inverter is a transformerless unit. Do not connect the
unit with PV modules that require positive (+) or negative (-) polarity to
ground. Only the array or PV module frame may be grounded.
5. Route the PV array conductors through the conduit to the desired entry conduit
hub on the DC side on the bottom of the inverter connection box. For the 600
series, use separate feedthroughs for the DC1 and DC2 inputs.
☞
Important
Use only UL listed rainproof or wet location hubs for entry into the
connection box.
6. Strip each DC conductor 20 mm (3/4″).
7. Connect the DC positive and the DC negative conductors to the correct polarity
of the DC input terminal block.
Guide each stripped conductor into the appropriate screw terminal.
DANGER:
Make sure the PV array polarity and voltage between the positive and
negative cables are correct before connecting the PV array cables to
the DC terminal block.
DANGER:
Assurez-vous que la polarité et le voltage des câbles positifs et
négatifs des piles PV sont corrects avant de brancher les câbles des
piles PV aux bornes CC.
Advanced Energy® AE 3TL Inverters
570-1003552-05A
Installing
4‑21
Содержание AE 3TL 1000 Series
Страница 2: ......
Страница 12: ...Advanced Energy xii 570 1003552 05A List of Tables...
Страница 14: ...Advanced Energy xiv 570 1003552 05A List of Figures...
Страница 26: ...Advanced Energy 1 12 Safety and Product Compliance Guidelines 570 1003552 05A...
Страница 64: ...Advanced Energy 4 28 Installing 570 1003552 05A...
Страница 86: ...Advanced Energy 6 4 Operating the Arc Fault Detection Unit 570 1003552 05A...
Страница 92: ...Advanced Energy 7 6 Data Monitoring and Controls 570 1003552 05A...
Страница 110: ...Advanced Energy 9 14 Troubleshooting and Solar Energy Technical Support 570 1003552 05A...
Страница 116: ...Advanced Energy A 6 Specifications 570 1003552 05A...
Страница 118: ...Figure 11 2 AE 3TL mechanical diagram Advanced Energy B 2 System and Mechanical Diagrams 570 1003552 05A...
Страница 120: ...Advanced Energy B 4 System and Mechanical Diagrams 570 1003552 05A...