DC1+ inputs
DC2+ inputs
DC1- inputs
DC2- inputs
Figure 4‑10. 600 series DC input terminal blocks in the connection box
DC- inputs
DC+ inputs
Figure 4‑11. 1000 series DC input terminal blocks in the connection box
8. For the 600 series, ensure that the same number of strings are installed in DC1
and DC2 inputs.
9. Tighten each screw terminal to 2.5 Nm (22 lbf-in).
10. Pull test each conductor.
AC Conductors
DANGER:
Electrical connections must comply with national and local standards.
Voltage drop and other considerations may dictate that larger wire sizes be
used.
Advanced Energy
4‑22
Installing
570-1003552-05A
Содержание AE 3TL 1000 Series
Страница 2: ......
Страница 12: ...Advanced Energy xii 570 1003552 05A List of Tables...
Страница 14: ...Advanced Energy xiv 570 1003552 05A List of Figures...
Страница 26: ...Advanced Energy 1 12 Safety and Product Compliance Guidelines 570 1003552 05A...
Страница 64: ...Advanced Energy 4 28 Installing 570 1003552 05A...
Страница 86: ...Advanced Energy 6 4 Operating the Arc Fault Detection Unit 570 1003552 05A...
Страница 92: ...Advanced Energy 7 6 Data Monitoring and Controls 570 1003552 05A...
Страница 110: ...Advanced Energy 9 14 Troubleshooting and Solar Energy Technical Support 570 1003552 05A...
Страница 116: ...Advanced Energy A 6 Specifications 570 1003552 05A...
Страница 118: ...Figure 11 2 AE 3TL mechanical diagram Advanced Energy B 2 System and Mechanical Diagrams 570 1003552 05A...
Страница 120: ...Advanced Energy B 4 System and Mechanical Diagrams 570 1003552 05A...