6240B DC Voltage Current Source/Monitor Operation Manual
2.2.9 Low-Resistance Measurement
2-52
2.2.9
Low-Resistance Measurement
This section describes an example of low-resistance measurement with a resistor of 10 m
connected.
Figure 2-19 Low-Resistance Measurement
Preparation
1. Initialize the 6240B following the same procedure described in Section 2.2.5,
2. Connect the DUT in 4 wires with the supplied input and output cables and alli-
gator clips. For more information on the 4-wire connection, refer to Section 5.1.2,
"Remote Sensing (2-Wire/4-Wire Connection)."
Source mode:
Low-resistance measurement pulse source
Pulse value:
10 mA
Source delay time (Tds):
0.03 ms (default)
Measurement delay time (Td):
5 ms
Pulse width (Tw):
20 ms
Period time (Tp):
40 ms
Integration time:
10 ms
Voltage limit value:
300 mV
Remote sensing:
4 wire
Positive-side source value
Negative-side source value