Lo
ad
T
ap
C
ha
ng
er
raise,lower
signals/alarms
position
BOM
MIM
IED
I
L1
,I
L2
,I
L3
TRM
3ph or ph-ph or 1ph Current
High Voltage Side
(Load Current) I
L
Low Voltage Side
Line Impedance R+jX
U
B
(Busbar Voltage)
Load Center
UL (Load Point Voltage)
IEC10000044-2-en.vsd
BIM
3ph or ph-ph or 1ph Voltage
IEC10000044 V2 EN-US
Figure 123:
Signal flow for a single transformer with voltage control
On the HV side, the three-phase current is normally required in order to feed the
three-phase over current protection that blocks the load tap changer in case of over-
current above harmful levels.
The voltage measurement on the LV-side can be made single phase-earth.
However, it shall be remembered that this can only be used in solidly earthed
systems, as the measured phase-earth voltage can increase with as much as a factor
√3 in case of earth faults in a non-solidly earthed system.
The analog input signals are normally common with other functions in the IED for
example, protection functions.
The LV-busbar voltage is designated U
B
, the load current I
L
and
load point voltage U
L
.
Automatic voltage control for a single transformer
SEMOD159053-73 v6
Automatic voltage control for tap changer, single control TR1ATCC measures the
magnitude of the busbar voltage U
B
. If no other additional features are enabled
(line voltage drop compensation), this voltage is further used for voltage
regulation.
1MRK 506 375-UEN A
Section 12
Control
Railway application RER670 2.2 IEC
291
Application manual
Содержание RELION RER670
Страница 1: ...RELION 670 SERIES Railway application RER670 Version 2 2 IEC Application manual ...
Страница 2: ......
Страница 22: ...16 ...
Страница 48: ...42 ...
Страница 70: ...64 ...
Страница 80: ...74 ...
Страница 100: ...94 ...
Страница 210: ...204 ...
Страница 364: ...358 ...
Страница 384: ...378 ...
Страница 468: ...462 ...
Страница 494: ...488 ...
Страница 504: ...498 ...
Страница 505: ...499 ...