Note
Action
1
2
3
1
2
3
xx1500002975
Find area 1.
2
Attachment screws: M16x70
Secure the screws in area 1.
Tip
Mark the screw with a marker pen after each
torque. This is to make sure that all screws have
been torqued.
3
Tightening torque: 300 Nm
xx1500003110
Examine that all screws have been torqued.
4
Concluding procedure
Note
Action
See
Performing a leak-down test on
Perform a leak-down test (if not already
done).
1
See
Changing oil in axis-2 and axis-3
.
Refill the gearbox with oil.
2
Axis Calibration is described in
with Axis Calibration method on page 805
Recalibrate the robot.
3
General calibration information is included
in section
.
DANGER
Make sure all safety requirements are met
when performing the first test run. These
are further detailed in the section
run may cause injury or damage on
page 27
.
4
Product manual - IRB 8700
717
3HAC052853-001 Revision: F
© Copyright 2015-2018 ABB. All rights reserved.
4 Repair
4.8.3 Replacing the axis-2 gearbox
Continued
Содержание IRC5 Compact
Страница 1: ...ROBOTICS Product manual IRB 8700 ...
Страница 2: ...Trace back information Workspace R18 1 version a12 Checked in 2018 03 27 Skribenta version 5 2 025 ...
Страница 16: ...This page is intentionally left blank ...
Страница 824: ...This page is intentionally left blank ...
Страница 838: ...This page is intentionally left blank ...
Страница 840: ...This page is intentionally left blank ...
Страница 846: ......
Страница 847: ......