
Note
Action
xx1500002326
Refit the hub.
3
Attachment screws: M6x30 12.9.
Remove the two M6x110 and fit the attach-
ment screws for the hub.
4
Loctite 243
Apply locking liquid (Loctite 243) on the
screws.
Note
The number of attachment screws differ
depending on gearbox.
Quantity:
•
Axis-1 = 6 pcs
•
Axis-2 = 8 pcs
•
Axis-3 = 8 pcs
•
Axis-4 = 4 pcs
•
Axis-5 = 6 pcs
•
Axis-6 = 4 pcs
Tightening torque: 14 Nm.
Secure the hub.
5
Performing a leak-down test
Note
Action
See
Performing a leak-down test on
Perform a leak-dowm test.
1
Preparations before refitting the motor
Note
Action
DANGER
Make sure that all supplies for electrical power,
hydraulic pressure, and air pressure are turned
off.
1
Remove old paint residues and other contamina-
tion from the contact surfaces on both motor and
gearbox.
2
Wipe clean the contact surfaces from any remain-
ing contamination.
3
Also wipe clean the o-ring groove.
Continues on next page
Product manual - IRB 8700
749
3HAC052853-001 Revision: F
© Copyright 2015-2018 ABB. All rights reserved.
4 Repair
4.8.4 Replacing the axis-3 gearbox
Continued
Содержание IRC5 Compact
Страница 1: ...ROBOTICS Product manual IRB 8700 ...
Страница 2: ...Trace back information Workspace R18 1 version a12 Checked in 2018 03 27 Skribenta version 5 2 025 ...
Страница 16: ...This page is intentionally left blank ...
Страница 824: ...This page is intentionally left blank ...
Страница 838: ...This page is intentionally left blank ...
Страница 840: ...This page is intentionally left blank ...
Страница 846: ......
Страница 847: ......