Note
Action
Attachment screws: M12x40 12.9 Gleitmo
603 (27 pcs)
Secure the turning disc with its attachment
screws and washers.
3
Tightening torque: 120 Nm
xx1500002318
Refitting the process turning disc
Note
Action
CAUTION
The process turning disc weighs 50 kg. All
lifting accessories must be sized accord-
ingly.
1
Attach the lifting accessories to the process
turning disc.
2
Wipe clean the contact surfaces.
3
Make sure the process turning disc is refit-
ted in the correct position.
4
Attachment screws: M12x40 12.9 Gleitmo
603 (22 pcs)
Secure the process turning disc with its
attachment screws and washers.
5
Tightening torque: 120 Nm
Concluding procedure
Note
Action
See
Changing oil, axis-6 gearbox on
Refill the gearbox with oil.
1
Axis Calibration is described in
with Axis Calibration method on page 805
Recalibrate the robot.
2
General calibration information is included
in section
.
DANGER
Make sure all safety requirements are met
when performing the first test run. These
are further detailed in the section
run may cause injury or damage on
page 27
.
3
794
Product manual - IRB 8700
3HAC052853-001 Revision: F
© Copyright 2015-2018 ABB. All rights reserved.
4 Repair
4.8.6 Replacing the axis-6 gearbox
Continued
Содержание IRC5 Compact
Страница 1: ...ROBOTICS Product manual IRB 8700 ...
Страница 2: ...Trace back information Workspace R18 1 version a12 Checked in 2018 03 27 Skribenta version 5 2 025 ...
Страница 16: ...This page is intentionally left blank ...
Страница 824: ...This page is intentionally left blank ...
Страница 838: ...This page is intentionally left blank ...
Страница 840: ...This page is intentionally left blank ...
Страница 846: ......
Страница 847: ......