![ABB HVC-C 100-150 kW Скачать руководство пользователя страница 6](http://html.mh-extra.com/html/abb/hvc-c-100-150-kw/hvc-c-100-150-kw_installation-manual_2837984006.webp)
15 Electrical installation of the control box.......................................63
15.1
Electrical installation of the control box - general procedure........................................ 63
15.2
Insert the cables to the control box.....................................................................................63
15.3
Connect the PE cables in the control box...........................................................................64
15.4.1 Connect the DC auxiliary power input cable to the control box...................65
15.4.2 Connect the DC auxiliary power output cables to the next control box.....66
15.5
15.6 Connect the interlock and DC guard cables to the control box.....................................67
15.6.1 Connect the interlock cable from the power cabinet (control box 1)...........67
15.6.2 Connect the inDC guard cable (input from the previous
15.6.3 Connect the inDC guard cable (output to the next control box)... 69
15.7
Connect the power supply feedback cable to the control box 1....................................69
15.8 Connect the DC power cables to the control box CR.........................................................71
15.8.1 Connect the DC cables to the control box (input and output to
the cable reel)...........................................................................................................71
15.8.2 Connect the DC cables to the control box (output to the next control
15.9.1 Connect the DC cables to the control box (input and output to
15.9.2 Connect the DC cables to the control box (output to the next control
15.10 Connect the cable reel interlock cable CR...........................................................................75
15.11 Connect the CCS control cable from the cable reel CR....................................................76
16 Paragraph left intentionally blank................................................77
17 Commissioning....................................................................................78
18 Access to parts...................................................................................80
18.3
18.4
18.5
18.6
18.7
18.8
18.9 Open the door of the box.......................................................................................................84
18.10 Close the door of the box.......................................................................................................85
Contents
6
6AGA000007-0611-EN | 002
Содержание HVC-C 100-150 kW
Страница 1: ...Installation manual HVC C 100 150 kW Overnight Copyright ABB All rights reserved CCS and CR variant ...
Страница 42: ...P a g e l e f t i n t e n t i o n a l l y b l a n k 42 6AGA000007 0611 EN 001 ...
Страница 79: ...P a g e l e f t i n t e n t i o n a l l y b l a n k 6AGA000007 0611 EN 001 79 ...
Страница 106: ......