Procedure
1. Align the holes in the brackets (A)
with the holes in the box (B).
Note: Install all four
brackets either
horizontally or vertically.
2. Install the washers (D) on the bolts
(C).
3. Install the bolts (C) in the holes
from the back of the box.
4. Tighten the bolts to the correct
torque. For the specifciation, refer
10.4
Install the power supply box on the wall
Preliminary requirements
1.
The holes in the wall are
prepared. Refer to section
2.
The brackets are installed
on the box. Refer to
•
Four anchor screws M8x80
•
Torque screwdriver
•
Spirit level
Procedure
1. Hold the box against the wall.
2. Align the holes in the brackets (A),
installed horizontally or vertically,
with the holes in the wall (B).
3. Install the mounting screws (C).
4. Tighten the screws to the correct
torque. For the specification, refer
.
A
D C
B
B
A
C
Mechanical installation of the power supply box
50
6AGA000007-0611-EN | 001
Содержание HVC-C 100-150 kW
Страница 1: ...Installation manual HVC C 100 150 kW Overnight Copyright ABB All rights reserved CCS and CR variant ...
Страница 42: ...P a g e l e f t i n t e n t i o n a l l y b l a n k 42 6AGA000007 0611 EN 001 ...
Страница 79: ...P a g e l e f t i n t e n t i o n a l l y b l a n k 6AGA000007 0611 EN 001 79 ...
Страница 106: ......