Procedure
1. Strip the insulation from the cable
(A).
2. Prepare the wires:
a. Twist the shield mesh (B).
b. Strip the wires (C) and (D). For
the specification, refer to
.
c. Prepare two wire loops (E) and
(F).
d. Crimp a ferrule onto the end of
the wires and the shield mesh.
3. Make sure that unused wires are
protected and do not touch metal
parts.
4. Loosen the screws on the terminals
(G) to (J).
5. Connect these wires:
a. Interlock shield mesh (D) from the control box to the earthing terminal to the
left of the X8-15 (J)
b. Interlock in wire (C) from the interlock out of the control box, brown, to the
terminal X8-14 (G)
c. Interlock loop 2 out wire (D) to the interlock in of the control box, white, to
the terminal X8-15 (H)
d. Wire loop (E) between the terminals X8-6 (M) and X8-7 (L)
e. Wire loop (F) between the terminals X8-10 (O) and X8-11 (N)
6. Tighten the terminal screws to the correct torque. For the specification, refer to
section
13.6
Connect the Ethernet cable
Preliminary requirements
•
Ethernet cable with the RJ45 plug. Refer to section
Procedure
1. Guide the cable (A) to the CAN2ETH
board (B).
2. Connect the RJ45 plug to the terminal
J1 (C).
F
E
A
C
B
D
J
H L N
M
O
G
B
C
A
Electrical installation of the power cabinet
6AGA000007-0611-EN | 001
57
Содержание HVC-C 100-150 kW
Страница 1: ...Installation manual HVC C 100 150 kW Overnight Copyright ABB All rights reserved CCS and CR variant ...
Страница 42: ...P a g e l e f t i n t e n t i o n a l l y b l a n k 42 6AGA000007 0611 EN 001 ...
Страница 79: ...P a g e l e f t i n t e n t i o n a l l y b l a n k 6AGA000007 0611 EN 001 79 ...
Страница 106: ......