![ABB HVC-C 100-150 kW Скачать руководство пользователя страница 70](http://html.mh-extra.com/html/abb/hvc-c-100-150-kw/hvc-c-100-150-kw_installation-manual_2837984070.webp)
Procedure
1. Strip the insulation from the end of
the cable (A). For the specifciation,
refer to section
.
2. Prepare the wires:
a. Twist the shield mesh (B).
b. Strip the insulation from the
end of the wires (C) to (F). For
the specifciation, refer to
c. Crimp ferrules onto the end of
the wires and the shield.
3. Loosen the screws on the terminals
(G) to (L).
4. Connect these wires:
a. Shield (B) to terminal X1-47 (G)
b. PS1_OK/14 (C), blue, to terminal X1-46 (L)
c. PS1_OK/13 (D), black, to terminal X1-45 (J)
d. OVP_AC_11 (E), yellow, to terminal X1-43 (K)
e. OVP_AC_14 (F), gray, to terminal X1-44 (H)
5. Tighten the screws to the correct torque. For the specification, refer to section
G
L
H
K
J
F
C
B
A
E
D
Electrical installation of the control box
70
6AGA000007-0611-EN | 001
Содержание HVC-C 100-150 kW
Страница 1: ...Installation manual HVC C 100 150 kW Overnight Copyright ABB All rights reserved CCS and CR variant ...
Страница 42: ...P a g e l e f t i n t e n t i o n a l l y b l a n k 42 6AGA000007 0611 EN 001 ...
Страница 79: ...P a g e l e f t i n t e n t i o n a l l y b l a n k 6AGA000007 0611 EN 001 79 ...
Страница 106: ......